Tenders
South Central Railway
Guntur, Andhra Pradesh, India
Supply Of (ph No.:16016) Lumefantine 480 Mg + Artemether 80 Mg Tab ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of After Cooler Complete Suitable For Trc 1000 Mn Type To M/s Elgi, Cbe Similar To Their Pa Rt. No. 00 04 4611 0. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Vijayawada, Andhra Pradesh, India
Supply Of Control Valve Bank With Connector As Per Kershaw Part No. 729345, Make- Kersha W ]
South Western Railway
Goa, Goa, India
Supply Of Set Of Spares & Consumables For Mfd Make Hres Supplied To Art/vsg As Per Attahced Anne Xure-1 [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Gondia, Maharashtra, India
Supply Of (old Pl: 14980290) Alarm Bell (gong Bell),size: 6" Heavy Duty Operating Voltable : 110 V Dc ,suitable For 700 & 1400 Hp Demu Dpc. Spec: [ Warranty Period: 30 Months After The Date Of D Elivery ]
South East Central Railway
Nagpur, Maharashtra, India
Supply Of Tab Entecavir 0.5 Mg ]
South East Central Railway
Gondia, Maharashtra, India
Supply Of Aoh Kit For Elgi Compressor Model Crc 150 As Per Elgi Part No. 072495169 Consisting Of 11 Items As Per Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Relay Oem:pl Part No:el-t7045/24v Make: Plasser [ Warranty Period: 6 Months After T He Date Of Delivery ]
Indian Railway
Varanasi, Uttar Pradesh, India
Supply Of Bolt 3/8-24 Dr Hex (r/c S.n. 1212) As Per Drg.no. 8028312 Alt Da Specn: Misc:401 Re V-r1 [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Guntur, Andhra Pradesh, India
Supply Of (phno:12039) Sulfasalazine 1000 Mg Tab/cap%u2026 ]
South Western Railway
Hubli, Karnataka, India
Supply Of Air Brake Rubber Hose Connection 700 X 15mm For All Main Line Coaches With Bogie Mount Ed Air Brake Cylinder Icf.emu.m.3.5.079. Column-iii, Alt.s/2 Item 3. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Western Railway
Hubli, Karnataka, India
Supply Of Clip Assembly For Wheel Set Earthing Equipment For Lhb Type Coaches To Rcf.drg. No.lw 71240.alt.a [ Warranty Period: 30 Months After The Date Of Delivery ]
rail wheel plant
Bangalore, Karnataka, India
Glass Wool Tape Of Specifications: 1. Width: 2 Inch 2. Thickness: 3 Or 5 Mil 3.packing: Rolls Of 50 Meters Note: Sample To Be Supplied For Acceptance Before Supplying Full Material [ Warranty Perio D: 30 Months After The Date Of Delivery ]
rail wheel plant
Bangalore, Karnataka, India
Micanite Tube: 1. Inner Diameter: 80mm, 2. Outer Diameter: 85mm 3. Height: 200mm 4. Co Nfirming To Is-2464/latest Sample Approval Should Be Taken Before Supplying The Full Quantity [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Karnataka Power Corporation Limited
Multi city, Karnataka, India
Providing 1 No. Of B2 Segment Muv/mpv/suv 12 Seater Force Cruiser Or Equivalent Vehicle Fitted With Gps, Abs System And With Air Bags Of 2022 & Above Model For Engineers Shift & General Duties, Ganeshgudi On 2500kms/month And 24 Hours Duty Basis For A Period Of Two Years (extenda...

