Tenders
NORTH EAST FRONTIER RAILWAY
Siliguri, West Bengal, India
Supply Of Lubricating Oil Grade 15w40 C14+ Or 15w40 C14+ For Cil- Kta50l & Qsk50l Demu En Gine To Rdso Approved Brands.. Servo Pride Xl 15w-40 C14+ Of Indian Oil Corporation Ltd. 2. Hp Dies Eline 15w40 C14+ Of M/s Hindustan Petroleum Corporation Ltd. 3. Mak- 15w40 C14+ Of Bharat ...
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Dust Bin For Lhb Coaches To Drg No. C&w.lgd.sk.no.1091, Alt.1 [ Warranty Period: 30 Mo Nths After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Non-contact Laser Scanning Based Wheel Profile Measurement System (laser Profile Gauge ) For Profile Range 16 To 32 Mm. A S Per Technical Specifications Attached As Annexure-a, Make/similar Paragon Instrumentation Engineers. Pvt.ltd(pie) Or Equivalent. With Calibration ...
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Brake Cylinder Pbac 254-130 For Lhb Coach To Ftrtipl Part No.4f-125155 Conforming To Rdso Specification No. Rdso/2011/cg-04. [ Warranty Period: 36 Months After The Date Of Delivery ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Knuckle For Transition And Non Transition Upgraded High Tensile Cbc Aar T Ype 'e' For Freight Stock. Drawing No. Rdso Sk-62724, Alt.31, Item No.2 With Wd-87004/s-01 , Alt.9 And To Rdso Specn.no.wd-70-bd-10 Rev.3 Of May.2022 [ Warranty Period: 30 Months Af Ter The Date O...
Indian Railway
Patiala, Punjab, India
Supply Of 3d Adjustable 360 Degrees Rotational Modified Driver Seat For Three Phase Locomotives As Per Specn. No.-clw/ms/3/021, Alt.-9 And Drg. No.- 1211-01.131-001, Alt.-2 An D Str No. Clw/2023/eldo/m/str/0154 Rev.-0. [ Warranty Period: 30 Months After The Date Of Deliv Ery ]
East Coast Railway
Bhubaneswar, Odisha, India
Supply Of Non-flamable Solvent Based Adhesive, To Drawing / Specification Icf/md/specn-093, Issue St Atus-01, Rev. No.0, June-98, Amendment Slip No-02 Of Aug-2010 [ Warranty Period: 9 Months After The D Ate Of Delivery ]
North Frontier Railway
Kamrup, Assam, India
Manufacturing & Supply Of Derailing Switch 60 Kg As Per Rdso Drg. No.rt-6068 Including All Fittings Complete In All Respect As Per Rdso Drawing [ Warranty Period: 30 Months After The Date Of Deliv Ery ]
South Central Railway
Vijayawada, Andhra Pradesh, India
Supply Of Hq _ Med _ (ph No. : 25100) Octreotide Acetate Lar 30 Mg Inj. ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of 16 Sq Mm (red) Thin Walled Flexible Elastomeric Cable With Copper Conductors For Work Ing Voltage Above 750 Volts Up To 1.8/3.0 Kv Rdso Letter No.-el/2.2.37 Dtd. 23.03.2009 As Per Rdso S Pecs No. Elrs/spec/elc/0019 Rev-4 Or Latest. [ Warranty Period: 30 Months After The...
South Central Railway
Guntakal, Andhra Pradesh, India
Supply Of Hq_med_[ph.no.25149 ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Coupler Body With Shank Wear Plate For Boxnhl Wagons Conforming To Rdso Specificat Ion No. Wd-70-bd-10 Rev.04 To Rdso Drg. No. Sk-62724, Item No. 01 & 10, Alt.31 / Latest. Spec: [ Wa Rranty Period: 72 Months After The Date Of Delivery ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Mcb For 5kva Transformer (primary) 16a, D Curve, 415 V Ac, 3 Pole, Breaking Capacity 10ka . Suitable For Lhb Type Ac Coaches. As Per Sr. No. 31 And Item Code F92 And Place Of Installation S1f107 Of Bill Of Material Spec No. Rdso/pe/spec/0184-2015(rev-1). Material Is Cat...
Northern Railway
Delhi, Delhi, India
Supply Of Parallel Clamp 150/ 105-150 Complete Assembly As Per Rdso Specification No. Ti/spc/ohe/fitting/0130(10/13) With A & C Slip No. 1 And Drawing No. Eti/ Ohe /p/1050-2 (rev-d) With R.i. No. 1051-2 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Lucknow, Uttar Pradesh, India
Supply Of 1. Buffer Tablets Ph 4.0 (20 Tablets X 01 No.)= 20 Nos. 2. Buffer Tablets Ph 7.0 (20 Tablets X 01 No.)= 20 Nos. 3. Buffer Tablets Ph 9.2 (20 Tablets X 01 No.)= 20 Nos. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ]

