Tenders
CHITTARANJAN LOCOMOTIVE WORKS
Hooghly, West Bengal, India
Dissolve Gas Analyzer, Detailed Description-supply, Installation And Commissioning Of Portabl E Microprocessor Based Dissolved Gas Analyzer (dga) Testing Kit For Transformer Oil , Specification As Per Annexure-a & Annexure-b. [ Warranty Period: 30 Months After The Date Of Deliver...
Northern Railway
Lucknow, Uttar Pradesh, India
Supply Of Ac Damping Network For Auxiliary Type 4tr 1979 Of Hind. [ Warranty Period: 30 Mon Ths After The Date Of Delivery ]
Modern Coach Factory Raebareli
BARELI, Madhya Pradesh, India
Supply Of Plain Washer For Clevis Pin 36 As Per Drg.no. Iso8738 Material To St52, Coating As Per Mdts-057, Packing Instruction - Pi042. [ Warranty Period: 30 Months After The Date Of Delive Ry ]
Rail Coach Factory
Kapurthala, Punjab, India
Supply Of Set Of Euro Bowl And Electro-pneumatic Pressurised Flushing System For L Hb Coaches. Note: Safety Clause Must Be Followed According To Annexure-a Of Dy.cple-i I L.no.rcf/emp/1 Dated. 01.04.2025, As Per Drawing: Mplebeplhb Version 1(installation & Com Missioning:inclusiv...
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Bearing Spherical Pivot To Dlw Part No: 17400016 And To Emd Part No. 40075199 Or Skf Bearing No. Ge 70 Txe -2ls Or Equivalent In Nbc, Fag, Ntn. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Air Spring (pressure Transmitter) Sensor For Railway Application Along With Suitable And Comp Atible Connector, Operating Rang 0-10 Bar, Operating Voltage 10-30 V-dc, Output 4-20 Ma, Confirming To Ip 65 Fitting Size 1/2 Inch . (material To Be Procured From Oem Or Its Au...
North Eastern Railway
Bareilly, Uttar Pradesh, India
Supply Of Brake Beam Support Complete To Rdso Drg. No.wd-87078-s/1 Alt. 3, Items 1, 2 & 3 (c/ 2) In Assembled Condition Bolted With M12 Bolt, Nut And Spring Washer. Matl. & Specn. Is:2062/2011w Ith Amndt. 1 Of Nov'2012 (re-affirm-2021), E250 A For Items 1 To 3 (of The Drawing), I...
South Eastern Railway
Multi city, Multi State, India
Electrical Work For Construction Of 3.1 M Wide Fob At Bhanjpur (vzr) & Bangriposi (bgy) Stations.
Metro Railway
Barasat, West Bengal, India
Appointment Of Authority Engineer For Providing Project Management Services For "design, Procurement & Construction Of Rcc Box Metro Tunnel Including Birati Ug Station Building & Subways (with Entry-exit Structures) For Two Underground Metro Stations (birati & Michael Nagar) By C...
Indian Railway
Varanasi, Uttar Pradesh, India
Supply Of Adjustable Spanner, Length : 10" Specification: As Per Document No. Specification/adjus Table Spanner 10"/01 Dated 31.01.2025 [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Safety Strap For Axle Guide To Icf Drg. No. Emu/m-0-1-019 Alt. F/3 For Mc & Hc C Coaches. (note: Alternate Steel To Is 2062 Fe 410 Wc May Be Used In Lieu Of Is 2062- Fe 41 0 Cu Wc As Indicated In Relevant Drg Itself). [ Warranty Period: 30 Months After The Date Of D Eli...
Southern Railway
Madurai, Tamil Nadu, India
Supply Of Multi Core Wire Coil 16/0.2 Sq.mm Pvc Insulation Copper Atc Cable Of 100 Meters Length Each Coil As Per Irs.s.76/89 Amendment 3 Or Latest (colour Grey-40nos, Black, Red,blu E Each 20 Nos). [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Hexagonal Head Screw M18 X 45 Mm With Zinc Coated Confirming To Is:1364 ( Part-2 ) And Pr Operty Class 8.8. [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Multi city, Multi State, India
Supply Of Portable Welding Generator Set (100/200a) With Accessories, Engine - Petrol Start - Petrol Run , Power -13 Hp, Air Cooled, No. Of Cylinder - 1, Transistorized Magneto Ignition With Recoil / Electric Start Syst Em, Generator 4.5k W, Single Phase 230v Ac Alternator With W...
Southern Railway
Madurai, Tamil Nadu, India
Supply Of 24 V Dc/110 V Ac, 500 Va Pwm Type On Line Inverter As Per Rdso Spec: No.irss-82/92(amn D.2) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]

