Tenders
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply Of One Rake Of Bogie Frame And Brackets For Kolkata Metro Coaches. Long Description As Per Attached Document. [ Warranty Period: 60 Months After The Date Of Delivery ]
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply, Installation , Testing And Commisioning Of Gps Based Public Address & Passe Nger Information System (papis) And Led Destination Board ( One Line) To Drg. No. 140-6-4-088, Col -2, Alt-b And To Spec. Rdso/cg - 18001 (rev.2) Or Latest In Lhb Non Ac Coaches. Fitment Of Destin...
Indian Railway
Goa, Goa, India
Supply Of 110v/200ah Low Maintenance Lead Acid Cell Type Battery Bank Containing 55 Nos. Cells Of 2v/200ah Back-up Capacity As Per Spec No.irs/s/88/2004 Or As Per Latest Amendment [ Warranty Period: 30 Months After The Date Of Delivery ]
South Western Railway
Bengaluru, Karnataka, India
Supply Of Bellows Set Consisting Of 1 No. Of Supply Air Below, 2 Nos Of Fresh Bel Lows And 2 Nos Of Return Air Bellow Ducts Made Of Meta Aramid / Para Aramid Fabric With Si Licone Rubber Coating On Both Sides For Lhb Eog /hog Type Ac Coaches As Per Rdso Specifica Tion No. Rdso / ...
South Central Railway
Kazipet, Telangana, India
Supply Of Set Of Overhauling Kit For 24a Double Cheek Valve Consisting Of 3 Items. Sl.no. Descripti On Sil Pt. No. Ftil Pt. No. Qty/set 1 O Ring 30070228 702708000 02 Nos. 2 O Ring 30070233 702705 000 02 Nos. 3 O Ring 30070224 702702000 03 Nos. [ Warranty Period: 30 Months After ...
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Teflon Tape For Sealing Threaded Pipe Joint Screwed Fitting 12mm Width 0.1 Mm Thick Of 12 Metres Roll Similar To Champion Teflon. [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Patiala, Punjab, India
Spares For Repair Of Kapp Niles Gear Grinding Machine, Model No. Ze 800 Sr.no.0300468 Including Installation, Laser Calibration And Arresting Of Leakage From Table, Which Will Result In Successful Grinding Of Components On Kapp Niles Gear Grinding Machine (mw No. 1598) Of Lms Of ...
South Central Railway
Krishna, Andhra Pradesh, India
Supply Of Secondary Brake Beam For Bmbs To Rdso Drawing No. Wd-08093-s-02 , Alt-03, Item No. 2. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Krishna, Andhra Pradesh, India
Supply Of Superior Kerosene Oil (sko)- Non-pds, Is: 1459: 2016 3rd Revision. [ Warranty Period : 30 Months After The Date Of Delivery ]
North Western Railway
Ajmer, Rajasthan, India
Supply Of High Tensile Tight Lock Cbc With Aar 'h' Type Head And Balanced Draft Gear. (u N-coupling Devices And Other Related Components Are To Be Packed Seprately) As Per 'rds O's Specification No. Rdso/2011/cg-03 Rev- 3, Amndt-1.( Tvs/gmt Make Silent Block) [ Warranty Per Iod: ...
North Eastern Railway
Gorakhpur, Haryana, India
Supply Of Disconnecting And Earthing Device 8-pole Two Way, No -off On Load 63amp, 750vac (1 000v Insulation ), Four Nos. Auxiliary Contact (2no + 2nc) With Heavy Handle And Pad Locking Arrang Ement In Earth Position, Without Sheet Steel/ Stainless Steel Enclosure, Suitable For A...
Southern Railway
Multi city, Multi State, India
Supply Of 3/4 Sq Drive Cordless Impact Wrench: Battery Operated 3/4 Square Drive 1600nm Fastening Brushless Motor Rail Tightening Machine(cordless Impact Wrench)with Special Extra Long Socket 41 Mm, 32 Mm & 28 Mm With Mobile Connectivity Feature With Additional Socket For Plate S...
NORTH EAST FRONTIER RAILWAY
Dibrugarh, Assam, India
Supply Of Copper Crimping Socket For 6 Sq.mm. E-beam Copper Cable With Stud Hole Dia-6.4 Mm And 5. 2 Mm. Qnty:- For Stud Hole Dia - 6.4 Mm = 3,500 Nos. And For Stud Hole Dia -5.2 Mm = 2,000 Nos. Make: Ka Mlesh & Brass Copper & Alloy India Limited Or Any Other Rdso Approved Make. ...
East Central Railway
SONPUR, Bihar, India
Comprehensive Annual Maintenance Contract -15 Kva, 10 Kva & 7.5 Kva Dg Sets Installed In Tower Wagon Of Sonpur Division For 03 Years.
South Central Railway
Krishna, Andhra Pradesh, India
Supply Of Primary Brake Beam For Bmbs To Rdso Drawing No.- Wd-08093-s-02, Alt.-03, Ite M No. - 01. [ Warranty Period: 30 Months After The Date Of Delivery ]

