Tenders
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply Of Hex Lock Nut With Pg Brass Metal Thread To Rdso Pe Spec Ac 0138 2009 Rev 1 A Nnexure A, Pg48 Table A-10 S.no 8. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Halisahar, West Bengal, India
Supply Of Combination Fuse Switch Units,rated Current 200 Amp,metal Clad,triple Pole With Neutral Link,degree Of Protection Ip - 2l3,as Per Is/iec 60947(part -1/2004) & Is/iec 60 947(part-3/1999) Quick Make & Break, Interlockable Cover ,uninterrupted Duty Utilazatio N Category Ac...
Eastern Railway
Halisahar, West Bengal, India
Supply Of Copper Ring Tongue Terminal Ends (insulated With Metal Reinforcement) For Solder Less Cr Imping To Cable Size 4mm2,stud-oba,(ref.-b.s.57: 1951) For Emu's. Clw Specification No. Clw/es/s-2 5/i, Colour Of Insulation Sleeve And Dimonnsions As Per M/s Dowells Category No.ps...
South Eastern Railway
Kharagpur, West Bengal, India
Supply Of Set Of Clamps Consists Of Three Items: 1) U Clamp For 1" Cdc As Per Drawing No. Kgp/el-864. Qty/set= 8 Nos. 2) Safety Clamp For C2w Relay Valve As Per Rdso Sketch No. Skel-4544, Alt '0'. Qty/set= 2 Nos. 3) U-clamp For Bp-fp Angle Cock Pipe Line As Per Drawing No. Kgp/el...
South Eastern Railway
West Singhbhum, Jharkhand, India
Supply, Installation And Commissioning Of Lcd Infrared Optical 3840 X 2160 Interactive Panel S And Accessories Interactive Smart Board, 75 Inch For Engineering Training Centre. Lg/samsung/sony/hp/ Canon/ Evota Make [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Kharagpur, West Bengal, India
Supply Of High Tensile Hex Head Screw And Nut M10 X 35 To Is: 1364/part 2 & 3/2002, Gr. 8.8 / 8 With 2 Flat Washer To Is: 2016 & 1 Spring Washer To Is: 3063. [ Warranty Period: 30 Months After The Date Of Del Ivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Solid Core Porcelain Stay Arm Insulator 1050 Mm Creepage Distance (20mm/kv) As Per R Dso Specification No. Ti/spc/ Ohe/ins/0071 (ri No. 6000-2) [ Warranty Period: 30 Months After The D Ate Of Delivery ]
Western Railway
Ahmedabad, Gujarat, India
Supply Of Provision Of Suspension Hook For Revised Design Of Transition Screw Coupling To Drawing No. Sk.dl-3119 For Wag9hc Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Safety Cover For Capillary Smoke Sampling Point As Per Rdso/2008/cg-04 Confirmi Ng To Make Tayal & Co. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Re-set Button Of Tayal & Co. Make Required For Fsds As Per Rdso/2008/cg-04. [ Warranty P Eriod: 30 Months After The Date Of Delivery ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Bolster Liner For Casnub 22 Bogies To Rdso Drg. No.wd-89067-s-4, Item No. 2 [two ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Hq_med_(ph No: 54031) Pneumococcal Conjugated Vaccine 13 Valent Absorbe D Single Dose Injection ]
Indian Railway
Varanasi, Uttar Pradesh, India
Supply Of Housing Bearing Kit (consisting 4 Items) This Is A Safety Item As Per Drg.no. K-1745036 Alt C Specn: Rdso Str No.mp.str.em.01.01.12(latest Rev.) [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Coimbatore, Tamil Nadu, India
Supply Of Bolt (ms) Hex. Hd. M12x110mm To Is: 1363 Part-i With Zinc Plating And Yellow Passivatio N To Is: 1573 For Electric Point Machine. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Hq_med_zrc_(ph No: 49146) Calamine + Aloe Vera + Paraffin Lotion - 100 Ml ]

