Tenders
Rail Coach Factory
Kapurthala, Punjab, India
Supply Of Pvc Flooring Roll 2x1850x14000mm, Colour As Per Sample No. Nacflg-02, As P Er Drawing/specification: Rdso/2006/cg-12 Revision 1 With Amendment Slip No. 3 Of August 20 16 With Pvc Welding Electrode Dia 4mm=12 Mtrs. Per Roll. [ Warranty Period: 72 Months Af Ter The Date O...
NORTH EAST FRONTIER RAILWAY
Dibrugarh, Assam, India
Corrigendum : Supply Of Copper Crimping Socket For 6 Sq.mm. E-beam Copper Cable With Stud Hole Dia-6.4 Mm And 5. 2 Mm. Qnty:- For Stud Hole Dia - 6.4 Mm = 3,500 Nos. And For Stud Hole Dia -5.2 Mm = 2,000 Nos. Make: Ka Mlesh & Brass Copper & Alloy India Limited Or Any Other Rdso A...
Modern Coach Factory Raebareli
BARELI, Madhya Pradesh, India
Supply Of Support Block As Per Drg. No. 4 10113.0.30.095.093, Packing Instruction: Pi100 Ver. 1.0 [ Warranty Period: 30 Months After The Date Of Delivery ]
North Central Railway
Allahabad, Uttar Pradesh, India
Supply Of Air Conditioner Unit For Track Machine Oem:pl Part No:cc7/hydroohneat-3900/evo/2 Make: Plasser, Webasto, Sidwal [ Warranty Period: 18 Months After The Date Of Delivery ]
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Impeller For Mvmt Dia 544 Mm As Per Clw Specification No.clw/es/b-14/c & Drawing No. Elw/bsl/wam-4/3/124-274 [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of 16 T Bogie Frame Complete For Icf Non Ac Coaches As Per Icf Drawing No Icf/sk-3-0-3-047 Alt.nil. & Specn.no.c-9202,rev-02 Or Latest. [ Warr Anty Period: 60 Months After The Date Of Delivery ]
Indian Railway
Varanasi, Uttar Pradesh, India
Supply Of Motorized Truck Assembly Wap7 Of 3 Phase Locomotive . As Per Drg.no. Ib011-00065 Alt 7 Specn: R Dso/2016/el/spec/0124 (rev.'0') Sep 2016 & As Per Annexure Ii And Iii. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Coast Railway
Visakhapatnam, Andhra Pradesh, India
Supply Of Maintenance Kit - 01 For Earthing Equipment, Consisting Of Following 3 Items, Material Confir Ming To Rcf Specification No. Edts-101, Rev C, Amendment 2, Corrigendum 7 Or Latest. 1) Earthing Cable To Rcf Drawing No. Lw 71249 Alt. C Qty. 1 No./kit. 2) Earthing Cable To R...
East Coast Railway
Visakhapatnam, Andhra Pradesh, India
Supply Of Maintenance Kit-03 For Wheel Set Earthing Equipment Consisting Of 6 Items Conf Orming To Rcf Specification No. Edts.101, Rev. C, Amendment No. 1 To 3, Corrigendum-1 To 8, An Nexure-1 S.no. Description Drg. No. Qty./set 1 )ss Bush Lw-71235 Alt. A 2 Nos. 2) Brush Holder H...
Indian Railway
Varanasi, Uttar Pradesh, India
Supply Of Motorised Truck Assembly Wag-9hc Of 3 Phase Locomotives As Per Drg.no. Ib011-00065 Alt 7 Spec N: Rdso/2016/el/spec/0124 Rev- '0' September 2016 & As Per Annexure I & Annexure Iii. [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Bijnor, Uttar Pradesh, India
Supply Of Master Cylinder Mh870001211 [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Patiala, Punjab, India
Supply Of All Steel Lock Nut To Set List El29310210 Rev.-0, Spec No. Clw/ms/3/089 Alt.-4, Drawing As Per Set List El29310210 Rev.-0, And Str No. Clw/2021/eldo/m/str/095 Rev.-1. [ W Arranty Period: 72 Months After The Date Of Delivery ]
Western Railway
Ahmedabad, Gujarat, India
Supply Of Pneumatic Valve [part No: Ii71411 Substitute 90371 ]
Western Railway
Ahmedabad, Gujarat, India
Supply Of Motor [plasser Part No: Hy910x56/61/w-vzb027 Rexroth Part No: A2fm56/61w-vzb027 (b Rin Idr902193108) Make-plasser / Rexroth. [ Warranty Period: 12 Months After The Date Of Delivery ]
Western Railway
Ahmedabad, Gujarat, India
Supply Of Re -usable Bippsy Forceps For Gastroscope 180cm Length (olympus Boston Scientific) ]

