Tenders
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Sinking Of 200mm (all Through) Big Dia. Tube Well Of 250.0 M Deep At 3rd Tw ,inter Connection Beteween Existing And New Pipe Line ,laying Of Dedicated/parallel Pipe Line And Balance Fhtc Of Khanpur Hulaspur Piped Water Supply Scheme At Chanchal
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Sinking Of Additional Tube Well To Resolve Tail End Pressure Along With Allied Works Like Inter Connection, Pump House, Approach Road Of Jalalpur Piped Water Supply Scheme At Chanchal -ii Block Of Malda District Under Malda Division, Phe Dte, Govt. O
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Restoration Of Road At Chanchal Zone -iii Water Supply Scheme Under Chanchal -i Block Under Malda Division, Phe Dte. In The District Of Malda.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Jack Pushing Of D.i. Pipe Of 200 Mm Dia. Through 600 Mm Dia M.s. Pipe By Hydraulic Jacking Technique Method At Choupaldanga Pipe Water Supply Scheme Under Malda Division, Phe Dte. In The District Of Malda.
PUBLIC HEALTH ENGINEERING DEPARTMENT
HARISHCHANDRAPUR, West Bengal, India
Corrigendum : Laying Of Parallel/dedicated Pipeline Improvement Of Functionality, Sinking Tube Well,inter Connection Beteween Tw And Existing Pipe Line, Construction Of Pump House Of Choupaldanga Piped Water Supply Scheme Of Harishchandrapur-i Block Under Malda
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Sinking Of Additional Tube Well To Resolve Tail End Pressure Along With Allied Works Like Inter Connection, Pump House, Approach Road Of Khanpur Piped Water Supply Scheme At Chanchal -ii Block Of Malda District Under Malda Division, Phe Dte, Govt. Of
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Design, Supplying. Fabrication, Erection An Commissioning Including 3 (three) Months Trial Run Of 25m3/hr. Capacity Pressure Type Iron Elimination Plant And Backwash Water Disposal At Head Work Site And Laying Of Dedicated/parallel Pipe Line
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Jack Pushing Of D.i. Pipe Of 200 Mm Dia. Through 600 Mm Dia M.s. Pipe By Hydraulic Jacking Technique Method At Gohila Area Of Choupaldanga Pipe Water Supply Scheme Under Malda Division, Phe Dte. In The District Of Malda.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 30 M3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Water Disposal, Construction Of Boundary
PUBLIC HEALTH ENGINEERING DEPARTMENT
HARISHCHANDRAPUR, West Bengal, India
Corrigendum : Dedicated/parallel Pipe Line For Better Functionality Of Paro Piped Water Supply Scheme At Harishchandrapur-i Block Of Malda District Under Malda Division, Phe Dte, Govt. Of West Bengal.
PUBLIC HEALTH ENGINEERING DEPARTMENT
HARISHCHANDRAPUR, West Bengal, India
Corrigendum : Sinking Tube Well,inter Connection Beteween Tw And Existing Pipe Line ,boundary Wall Laying Distribution System Of Konar Piped Water Supply Scheme At Harishchandrapur -i Block Of Malda District Under Malda Division, Phe Dte, Govt. Of West Bengal.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Dedicated/parallel Pipe Line For Better Functionality And Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 25m3/hr. Capacity Pressure Type Iron Elimination Plant And Backwash Water Disposal Of Ch
PUBLIC HEALTH ENGINEERING DEPARTMENT
HARISHCHANDRAPUR, West Bengal, India
Corrigendum : Sinking Tube Well,inter Connection Beteween Tw And Existing Pipe Line And Laying Of Pipeline Of Paro Piped Water Supply Scheme At Harishchandrapur-i Block Of Malda District Under Malda Division, Phe Dte, Govt. Of West Bengal.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Construction Of Approach Road At Ohr And 2nd Tube Well Site With Land Development, Laying Of Parallel/dedicated Pipeline For Better Functionality And Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run
PUBLIC HEALTH ENGINEERING DEPARTMENT
Malda, West Bengal, India
Corrigendum : Design, Supplying. Fabrication, Erection An Commissioning Including 3 (three) Months Trial Run Of 100 M3/hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Water Disposal At Head Work Site, Constru

