Tenders
PUBLIC HEALTH ENGINEERING DEPARTMENT
Hooghly, West Bengal, India
Corrigendum : Supply Fitting Fixing Of Ferrule In The Existing Fhtc Work At Chak Hazi And Benga Sashtipur Village Under Batanal Zone - I Pwss, Within Armbag Development Block, Under Arambag Sub Division Of Hooghly Division, P.h.e. Dte.
South Central Railway
Secunderabad, Telangana, India
Corrigendum : South Central Railway Construction Organization-engineering, Procurement And Construction (epc) Contract For Construction Of New Doubling Line Works From Revururamapuram (rrpm) (incl.) To Sant Seva Lal Maharaj (sslm) (excl.) From Km 36.60 To Km 65.10 (i.e., 28.50 Km...
Rail Coach Factory
Kapurthala, Punjab, India
Corrigendum : Supply Of Pipe Clamp 3.15x30x134, As Per Drawing: T-6-3-767 Alt N Item 9, Packing Instruction: Pi001: Suitably Packed In Jute Bags, Quality Plan: N.a. [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Rail Coach Factory
Kapurthala, Punjab, India
Corrigendum : Supply Of Arrangement Of Mug, As Per Drawing: Icf/sk-6-3-481 Alt E, Packing Instruction: Pi0 42 Version 1.0: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Dam A...
Rail Coach Factory
Kapurthala, Punjab, India
Corrigendum : Supply Of Hose Coupling, As Per Drawing: Cc63278, Packing Instruction: Suitably Packed In Ju Te Bags, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kapurthala, Punjab, India
Corrigendum : Supply Of Bracket For Fixing Stretcher Colour Shade Satin Blue To Isc-177) Md22151 D T 26.05.08, As Per Drawing: Lb64142, Packing Instruction: Pi013: Brown Papper Wrapping For Indi Vidual Item Collectively Packed In Jute Bags, Quality Plan: N.a. [ Warranty Period: 3...
South Western Railway
KRISHNARAJAPURAM, Karnataka, India
Corrigendum : Supply, Installation And Commissioning Of Eot Crane Of 10 T Capacity With Auxili Ary Hoist Of 3t Capacity And With Shrouded Dsl Of 90 Meter Length For Machine Repair Bays At Dsl/kjm As Per The Enclosed Specification. [ Warranty Period: 24 Months After The Date Of De...
Gujarat Industries Power Company Limited
Surat, Gujarat, India
Corrigendum : Biennial Handling And Maintenance Contract 2025 To 2027 For Phase I And Ii Ac And Ventilation System For The Period Of Two Years.
Madhya Gujarat Vij Company Limited
Multi city, Gujarat, India
Corrigendum : Catering Contract For Providing Tea/cofee & Lunch At Gekc, V V Nagar Under Anand Circle.
Hindustan Aeronautics Limited
Hyderabad, Telangana, India
Corrigendum : Design And Development Of Specialized Digital Computer Of Su-30 Aircraft
North Western Railway
Jaipur, Rajasthan, India
Corrigendum : Running Contract For Manufacture And Supply Of Composite Grooved Rubber Sole Plate S 6.2 Mm Thick With Horns For 60 Kg Psc Sleepers To Rdso Drg No.t-6618 Or Latest With Reference Dat E As Tender Closing Date, Conforming To Indian Railway Standard Specification For R...
Rail Coach Factory
Kapurthala, Punjab, India
Corrigendum : Supply Of Stainless Steel Step Complete, As Per Drawing: Lw41106 Alt B Item 1, [ Warranty Period: 30 Months After The Date Of Delivery ]
CHITTARANJAN LOCOMOTIVE WORKS
Chittaranjan, West Bengal, India
Corrigendum : Supply Of Single Core Cable 9gkw-ax150, 4000v, Bk, As Per Clw's Specn. No. Clw/es/3/04 58/e. [ Warranty Period: 30 Months After The Date Of Delivery ]
PRASAR BHARATI
Delhi, Delhi, India
Corrigendum : Supplying And Replacement Of Existing Reciprocating Type 120 Tr. Water Cooled Chiller With Screw Type Etc. At Sirifort Auditorium, New Delhi
North Central Railway
Kanpur, Uttar Pradesh, India
Corrigendum : Supply Of Armature Shaft For 4601 Az Emu Tm Armature As Per Drg No.1tms/cnb/drg/90/6 Alt-3 [ Warranty Period: 30 Months After The Date Of Delivery ]

