Tender Results
Supply Of Shim For Air Spring (train 18 Bogies For Packing For Wheel Wear) Asper Icf Drawing No. Aaa05162 [ Warranty Period: 30 Months Aft Er The Date Of Delivery ]
Organization: Southern Railway
Location: Thiruvananthapuram, Kerala, India
Ref id: 12858538
AOC Date: 30th Jun, 2025
Amount: ₹926300.00
View DetailsSupply Of Brake Head To Rdso Drg. No. Wd-08093-s-02, Alt. 3, Item No. 7, Material And Specification Confirming To Rdso Specification No. Wd-23-bmbs-2008 Rev. 1 With Amendment No.1 Of Sept 2016. [ Wa Rranty Period: 36 Months After The Date Of Delivery ]
Organization: CENTRAL RAILWAY
Location: Bhusawal, Maharashtra, India
Ref id: 12858539
AOC Date: 30th Jun, 2025
Amount: ₹770835.00
View DetailsSupply Of 1. Air Spring Failure Indication Cum Brake Application (fiba) System To Rdso S Pec No.rdso/2015/cg-05,(latest Revision) 2. Hose Connection 3/4\"x 550 Mm As Per Fiba Rdso Specification C-k-407 (latest Revision)with Rdso Drawing Number Rdso (c) Sketch-k1054,qt Y-2 Nos, (total Qty-4nos, Including 2nos In Rdso Spec At Sl.no-1) Note : 1.item No -4 Of Claus E 4.1 To Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating C Ock With Olp Type As Per Rdso Sketch 97002 (latest Alteration) 2.item No -5 Of Clause 4.1 T O Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating Cock Wi Th Olp Type As Per Rdso Sketch 98013 (latest Alteration) [ Warranty Period: 72 Months After The Date Of Delivery ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
Ref id: 12858540
AOC Date: 30th Jun, 2025
Amount: ₹130637328.00
View DetailsSupply Of 1. Air Spring Failure Indication Cum Brake Application (fiba) System To Rdso S Pec No.rdso/2015/cg-05,(latest Revision) 2. Hose Connection 3/4\"x 550 Mm As Per Fiba Rdso Specification C-k-407 (latest Revision)with Rdso Drawing Number Rdso (c) Sketch-k1054,qt Y-2 Nos, (total Qty-4nos, Including 2nos In Rdso Spec At Sl.no-1) Note : 1.item No -4 Of Claus E 4.1 To Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating C Ock With Olp Type As Per Rdso Sketch 97002 (latest Alteration) 2.item No -5 Of Clause 4.1 T O Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating Cock Wi Th Olp Type As Per Rdso Sketch 98013 (latest Alteration) [ Warranty Period: 72 Months After The Date Of Delivery ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
Ref id: 12858541
AOC Date: 30th Jun, 2025
Amount: ₹195898290.00
View DetailsSupply Of 1. Air Spring Failure Indication Cum Brake Application (fiba) System To Rdso S Pec No.rdso/2015/cg-05,(latest Revision) 2. Hose Connection 3/4\"x 550 Mm As Per Fiba Rdso Specification C-k-407 (latest Revision)with Rdso Drawing Number Rdso (c) Sketch-k1054,qt Y-2 Nos, (total Qty-4nos, Including 2nos In Rdso Spec At Sl.no-1) Note : 1.item No -4 Of Claus E 4.1 To Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating C Ock With Olp Type As Per Rdso Sketch 97002 (latest Alteration) 2.item No -5 Of Clause 4.1 T O Rdso Specno: Rdso/2015/cg-05,(latest Revision) Shall Be Supplied With Isolating Cock Wi Th Olp Type As Per Rdso Sketch 98013 (latest Alteration) [ Warranty Period: 72 Months After The Date Of Delivery ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
Ref id: 12858542
AOC Date: 30th Jun, 2025
Amount: ₹76806200.00
View DetailsSupply Of Non Asbestos Based K Type High Friction Composite Brake Block For Bmbc System Coaching St Ock As Per Rdso Drg. No.- K98066, Alt.-6, Confirming To Rdso Specn. No.- C- 9809, Rev.- 4, May- 2009 Wit H Amnd. Slip No.- 1 Of September-2016 [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Western Railway
Location: Surat, Gujarat, India
Ref id: 12858543
AOC Date: 30th Jun, 2025
Amount: ₹999460.00
View DetailsSupply Of Speed Prob Housing (machined) Vented For Traction Motor Type 6fra 6068 For Wag-9 & Wap-7 (3 Phase) Locos. As Per Clw s Specn. No. 4tms.096.068 Rev-2 Alt-1, Clw s Drg. No. 1twd.096 .077 Alt-5 & Rdso s Str No. Rdso/2007/el/str/0021 Rev-1. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: Kanchrapara, West Bengal, India
Ref id: 12858544
AOC Date: 30th Jun, 2025
Amount: ₹2320824.00
View DetailsSupply Of Pvc Flat Moulding As Per Cwm/ Pl Drg. No. C/ Cf-488/c, Alt- Nil. Item No. - 5; Size 50x3x2000 Mm. As Per Is: 6307- 2023, Type -1 . [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Organization: Western Railway
Location: Bhavnagar, Gujarat, India
Ref id: 12858545
AOC Date: 30th Jun, 2025
Amount: ₹548358.13
View DetailsSupply Of Stainless Steel Slotted Pan Head Tapping Screw S.t- 4.8 X 22c To Is:7173-1989 ( Reaffirmed 2004), A2-70 To Is 1367(part-14)-2002. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: LILUAH, West Bengal, India
Ref id: 12858546
AOC Date: 30th Jun, 2025
Amount: ₹1228138.10
View DetailsSupply Of M-48 Sch Repair Kit For Ftil Make Air Dryer s Consistig Of 19 Items As Per Encl Osed List. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Western Railway
Location: Ahmedabad, Gujarat, India
Ref id: 12858547
AOC Date: 30th Jun, 2025
Amount: ₹519162.24
View DetailsSupply Of 08 Kw 240/415v Water Immersion Heater Costing Of 03 Nos. \"u\" Type Shaped Heating Elemen Ts Each Of 2666w, 240v Made Out Of 11mm Dia, 12mm Thick Ss304 Flange With Immersion Length 1170mm Out Of Which 150mm Shall Be Cold Zone.make/brand ? Heat Plus, Theta , Telelec Only [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Southern Railway
Location: Chennai, Tamil Nadu, India
Ref id: 12858548
AOC Date: 30th Jun, 2025
Amount: ₹10030000.00
View DetailsSupply Of Fire Retardant Curtain Fabric Cloth For 1st Ac Coaches As Per Rdso s Spec. No. C-9911 (rev.3) Of February 2005 With 6 Amendments -last Amendment Slip No.6 Of August 2016 & Corrigendu M No.1 Of May 2015, Width 120 Cm +2/-0 Cm, Mass: 250%b120 Gms Per Square Meter, Colour Shade A Nd Pattern As Per Rdso s Approved Sample Grade No. Ppa-57/1a Or Fr 1316828-76a. [ Warranty Per Iod: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: Halisahar, West Bengal, India
Ref id: 12858549
AOC Date: 30th Jun, 2025
Amount: ₹3832290.00
View DetailsSupply Of Procurement Of Hot Forged Solid Steel Rivets Etc.
Organization: Eastern Railway
Location: Jamalpur, Bihar, India
Ref id: 12858550
AOC Date: 30th Jun, 2025
Amount: ₹1539865.90
View DetailsSupply Of copper Pipe Fittings For Wap-7 For Ccb Brake System To Set List No. El29230767 Rev. 0, Specification No. Clw/ms/3/067 Alt. 4, Drawings As Per Set List No. El29230767 Rev. 0, And Str No. Clw/2021/eldo/
Organization: Patiala Locomotive Works
Location: Multi city, Multi State, India
Ref id: 12858551
AOC Date: 30th Jun, 2025
Amount: ₹1183631.94
View DetailsSupply Of Pu Painting Kit Of Ls/rajdhani Colours Scheme Coaches As Per Rdso Spec. No. M&c/pcn/100 /2018 With Amndt. No. 1b As Additional Requirement Annexure b (1) Pu Surfacer ( Two Pack) Qty. 45 Ltrs. (2) Unsaturated Polyster Based Knifing Stopper Putty ( Two Pack ) Qty. 04 Kgs. (3)full Gloss Pu Top Coat Gr Ey ( Two Pack ) To Colour Shade Ral 7001 Qty. 47 Ltrs. ( 4)full Gloss Pu Top Coat Single Red ( Two Pack ) To Colour Shade Isc No. 537 Of Is:5/2007 ,qty. 25 Ltrs. ( 5 ) Thinner For Pu Paint Compatible With Pu Top Coat Qty. 65 Ltrs. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
Organization: North Western Railway
Location: Ajmer, Rajasthan, India
Ref id: 12858552
AOC Date: 30th Jun, 2025
Amount: ₹4430935.40
View DetailsSupply Of copper Pipe Fittings For Wap-7 For Ccb Brake System To Set List No. El29230767 Rev. 0, Specification No. Clw/ms/3/067 Alt. 4, Drawings As Per Set List No. El29230767 Rev. 0, And Str No. Clw/2021/eldo/
Organization: Patiala Locomotive Works
Location: Multi city, Multi State, India
Ref id: 12858553
AOC Date: 30th Jun, 2025
Amount: ₹1765115.16
View DetailsSupply Of Pu Painting Kit Of Ls/rajdhani Colours Scheme Coaches As Per Rdso Spec. No. M&c/pcn/100 /2018 With Amndt. No. 1b As Additional Requirement Annexure b (1) Pu Surfacer ( Two Pack) Qty. 45 Ltrs. (2) Unsaturated Polyster Based Knifing Stopper Putty ( Two Pack ) Qty. 04 Kgs. (3)full Gloss Pu Top Coat Gr Ey ( Two Pack ) To Colour Shade Ral 7001 Qty. 47 Ltrs. ( 4)full Gloss Pu Top Coat Single Red ( Two Pack ) To Colour Shade Isc No. 537 Of Is:5/2007 ,qty. 25 Ltrs. ( 5 ) Thinner For Pu Paint Compatible With Pu Top Coat Qty. 65 Ltrs. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
Organization: North Western Railway
Location: Ajmer, Rajasthan, India
Ref id: 12858554
AOC Date: 30th Jun, 2025
Amount: ₹2315521.08
View DetailsSupply Of Spare Rotary Switch (4 Pole/2way) For Domino Type Control Cum Indicatio N Panel Of Lc Gates Or Similar. Rotary Switch (4 Pole/2 Way) Has No. Irs/rdso Specific Ation No. It Is A Part Of Lc Gate Panel. Specification No. Of Lc Gate Panel Irs : S - 36/87 . ( Accepted Make .- Deltron Or Similar) . [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Organization: Eastern Railway
Location: Sealdah, West Bengal, India
Ref id: 12858555
AOC Date: 30th Jun, 2025
Amount: ₹784700.00
View DetailsSupply Of Ball Bearing 6312 - C3 Used For Conventional And Wap-7 & Wag-9 (3 Phase) Lo Cos. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: Kanchrapara, West Bengal, India
Ref id: 12858556
AOC Date: 30th Jun, 2025
Amount: ₹1633462.20
View DetailsSupply Of Spring Loaded Support Device (for High Tensile Tight Lock Centre Buffer Co Upler With Aar h Type Head And Balanced Draft Gear) To Frontier Drawing No. Fasl/sld/ 0856-a And Conforming To Rdso Specification No. Rdso/2011/cg-03 (rev-1), Amdt-1 [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Organization: South Central Railway
Location: Multi city, Multi State, India
Ref id: 12858557
AOC Date: 30th Jun, 2025
Amount: ₹1223504.24
View Details