Tender Results

Corrigendum : Z.o.iv.c.no.b3/9817/2024-1 Providing Hydraulic Excavator For The Regulation Of Garbage In Kodungaiyur Dumping Ground In Div - 37, Unit - 09, Zone Iv

Organization: CORPORATION OF CHENNAI

Location: Chennai, Tamil Nadu, India

ITB id: 12842639

AOC Date: 30th Jan, 2025

Amount: ₹1201334.40

View Details

Mudhalvarin Grama Salaigal Membattu Thittam Mgsmt 2025-26 Phase- I Package No. Tn05-04 3 Nos In Oddanchatram Block Of Dindigul District - Name Of The Work : 1. Strengthening Of The Road From Vadamadurai - Oddanchatram Road To Thippampatty Km 0/0 - 1/550 (r 131)estimate Amount : Rs. 55.40 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -1/550, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -1/550, Picking The Existing Worn - Out Wbm / Bt Surface Using 5 - 10 Cm Thick Including Allcost Andconveyance Of All Materials And All Labour Charges Etc Complete, Km 0/0 -1/550, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -1/550, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -1/550, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -1/550, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -1/550, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -1/550, Provision For Km Stone, Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Km Stone, Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 2. Strengthening Of The Road From Javadupatty Ad Colony To Muslim Mosque Road. Km 0/0 - 0/850 (r 360)estimate Amount : Rs. 30.62 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -0/850, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -0/850, Picking The Existing Worn - Out Wbm / Bt Surface Using 5 - 10 Cm Thick Including Allcost Andconveyance Of All Materials And All Labour Charges Etc Complete, Km 0/0 -0/850, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -0/850, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -0/850, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -0/850, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -0/850, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -0/850, Provision For Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 3. Strengthening Of The Road From Bodikundur - Thippampatty To Thirumanikkapuram Km 0/0 - 0/420 (r 530)estimate Amount : Rs. 15.34 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -0/420, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -0/420, Picking The Existing Worn - Out Wbm / Bt Surface Using 5 - 10 Cm Thick Including Allcost Andconveyance Of All Materials And All Labour Charges Etc Complete, Km 0/0 -0/420, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -0/420, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -0/420, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -0/420, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -0/420, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -0/420, Provision For Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}

Organization: Rural Development And Panchayat Raj Department

Location: Dindigul, Tamil Nadu, India

ITB id: 12842640

AOC Date: 21st Mar, 2025

Amount: ₹9952676.32

View Details

Tapper Roller Bearing For Journal Assembly Of Xrp 803 Mills

Organization: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

Location: Mettur, Tamil Nadu, India

ITB id: 12842641

AOC Date: 11th Mar, 2025

Amount: ₹442494.00

View Details

Cutting Uprooting And Removal Of Trees In Plot No. 1a 1b At Sipcot Industrial Park Panapakkam

Organization: State Industries Promotion Corporation Of Tamilnadu Limited

Location: Ranipet, Tamil Nadu, India

ITB id: 12842642

AOC Date: 3rd Feb, 2025

Amount: ₹1575000.00

View Details

Construction Of Grand Library And Intellectual Centre At Trichy In Trichy District

Organization: Public Works Department

Location: Trichy, Tamil Nadu, India

ITB id: 12842643

AOC Date: 16th Apr, 2025

Amount: ₹1799128770.00

View Details

Corrigendum : Nagercoil Corporation Providing Cement Concrete Road At Venugopal Samy Ngr 1st - Rl (150005s400),paramartha Lingapuram Street 2 - Rl (150006s404),telugu Chetti St - Rl (150007s409),valiyammal Samathi St - Rl (150008s416),tirupathi Nager - R L (150009

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842644

AOC Date: 21st Feb, 2025

Amount: ₹3334757.94

View Details

Corrigendum : Nagercoil Corporation Providing Cement Concete Road At Kottavilai Road (150004s368),kottavilai Road 1 (150004l0326),nesavalar Colony - Rl (150017l0332),arunthai Nager-rl (150020s545),nesamony Nager - Rl (150021l0351),thadi Timber Depot. Road - Rl(15

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842645

AOC Date: 21st Feb, 2025

Amount: ₹3347160.00

View Details

Corrigendum : Nagercoil Corporation Providing Cement Concrete Road At Hindhu College 5th Crs Road (150041r830),muthu Sudha Colony (150042s878),keezha Tharavilai Palavesam Swamy Kovil Street - Rl (150045l249),cresant Nagar (150047r959),azad Garden 5th St (150048r99

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842646

AOC Date: 21st Feb, 2025

Amount: ₹2056857.72

View Details

Construction Two Class Room School Building In Pum School At Arumuga Goundanur Perurchettipalayam

Organization: Rural Development And Panchayat Raj Department

Location: Coimbatore, Tamil Nadu, India

ITB id: 12842647

AOC Date: 14th Feb, 2025

Amount: ₹3413356.45

View Details

Corrigendum : Nagercoil Corporation Providing Cement Concrete Road At Flower Street (150033s1139),vinayagar Street (150034s1054),chitra Raja Puram (150035s1052), Muthaliyar Cross Street (150036l230), Iruthayam Hospital Next Road - Rl (150037s1076),in Ward No.33,34

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842648

AOC Date: 21st Feb, 2025

Amount: ₹1876788.90

View Details

Corrigendum : Nagercoil Corporation Providing Bt Road By Using Cmp At Perumal Nagar (150018r322),kgmc Mens Hospital Road (150019s536) ,scott 2nd Crs Rl (150022r431),court Cross Road (150023r445),karuppukottai Street (150026s634),ecar St-rl (150027537) In Ward No.1

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842649

AOC Date: 21st Feb, 2025

Amount: ₹3187125.81

View Details

Construction Of Chief Ministers Mini Stadium At Athoor Assembly Constituency In Dindigul District

Organization: Sports Development Authority Of Tamil Nadu

Location: Dindigul, Tamil Nadu, India

ITB id: 12842650

AOC Date: 29th Apr, 2025

Amount: ₹25150491.00

View Details

Supply And Installation Of Texture Analyser- 1 No. At R And D Laboratory, Ambattur

Organization: Tamilnadu Co-op Milk Producers Federation Ltd.

Location: AMBATTUR, Tamil Nadu, India

ITB id: 12842651

AOC Date: 27th Mar, 2025

Amount: ₹2442600.00

View Details

Corrigendum : Nagercoil Corporation Providing Bt Road By Using Cmp At Kalai Nagar (150043s897),ponnappa Nadar Colony Main Road (150044r1226),ctm Puram -2 Rl (150049r1588) Of Ward No.43,44,49

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842652

AOC Date: 21st Feb, 2025

Amount: ₹1761084.28

View Details

Corrigendum : Nagercoil Corporation Providing Bt Road By Using Cmp At Mugilanvilai To Sivishesapuram Road (150050r1020) In Ward No.50

Organization: MUNICIPAL CORPORATION

Location: Nagarcoil, Tamil Nadu, India

ITB id: 12842653

AOC Date: 21st Feb, 2025

Amount: ₹3165891.00

View Details

Construction Of Chief Ministers Mini Stadium At Sendhamangalam Assembly Constituency In Namakkal District

Organization: Sports Development Authority Of Tamil Nadu

Location: Namakkal, Tamil Nadu, India

ITB id: 12842654

AOC Date: 29th Apr, 2025

Amount: ₹24698776.00

View Details

Supply Of Furniture Items - Purchase Of Laboratory Students Chair And Table, Wooden Cushion Chair With Arm:(laboratory Students Chair), Steel Plain Table :(laboratory Students Table)

Organization: HIGHER EDUCATION

Location: Coimbatore, Tamil Nadu, India

ITB id: 12842655

AOC Date: 21st Mar, 2025

Amount: ₹176700.00

View Details

Annual Maintenance Working Estimate Of 186 Tngrhs Out Of 294 Tngrhs Flats At Anbu Nagar In Tirunelveli District For The Year 2024-2025

Organization: TAMIL NADU HOUSING BOARD

Location: Tirunelveli, Tamil Nadu, India

ITB id: 12842656

AOC Date: 18th Feb, 2025

Amount: ₹33750.00

View Details

Corrigendum : Annual Maintenance Working Estimate Of 306 Tngrhs Flats At M.n Colony In Tirunelveli District For The Year 2024-2025

Organization: TAMIL NADU HOUSING BOARD

Location: Tirunelveli, Tamil Nadu, India

ITB id: 12842657

AOC Date: 18th Feb, 2025

Amount: ₹38759.00

View Details

Mudhalvarin Grama Salaigal Membattu Thittam Mgsmt 2025-26 Phase- I Package No. Tn05-02 3 Nos In Oddanchatram Block Of Dindigul District - Name Of The Work : 1. Upgradation Of The Road From Veeralapatty - Velur Bt Road Km 0/0 - 1/060 (r 102)estimate Amount : Rs. 35.23 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -1/060, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -1/060, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -1/060, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -1/060, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -1/060, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -1/060, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -1/060, Provision For Km Stone, Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Km Stone, Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 2. Upgradation Of The Road From Komalipatty To Thalaiyuthu - Edaiyakottai Road (via,burial Ground) Km 0/0 - 0/800 (r 550)estimate Amount : Rs. 35.59 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -0/800, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -0/800, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -0/800, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -0/800, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -0/800, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -0/800, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -0/800, Provision For Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Construction Of Retaining Wall At Ch 0/6, Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation., Cement Concrete 1 : 4 : 8 Mix Using 40mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed., Cement Concrete 1 : 3 : 6 Mix Using 40mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed., Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29m High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25x25x3mm For Boarding Laid Over Silver Oak (country Wood) Joists Of Size 10x6.50cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13cm Dia Spaced At 75cm C/c Etc. Complete., Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 3. Upgradation Of The Road From Periyakottai Kaliammankovil To Thumbalapattiyar Thottam Road Km 0/0 - 1/000 (r 389)estimate Amount : Rs. 26.54 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -1/000, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -1/000, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -1/000, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -1/000, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -1/000, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -1/000, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -1/000, Provision For Km Stone, Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Km Stone, Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}

Organization: Rural Development And Panchayat Raj Department

Location: Dindigul, Tamil Nadu, India

ITB id: 12842658

AOC Date: 21st Mar, 2025

Amount: ₹9560298.07

View Details
Scroll to Top