Tender Results

Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For Use With Erc Mk -v On Wider Base Concrete Sleeper Suitable For 60 Kg Rail Confirming To Rdso Drg. No. T-6938 And T-6 939 With Latest Alterations. Irs Specification For Gfn-66 Insulating Liners Sl. No. T-44-2023 With Latest Amendment. Each Set Of One Gfn Liner To Drg. No. T-6938 And One Gfn Liner To Drg. No. T-6939 (the Alt. In Drawing And Specification Issued By Rdso Up To One Month Prior To Tender Opening Date Shall B E Applicable In This Tender) [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: NORTHERN RAILWAY

Location: Multi city, Multi State, India

ITB id: 12827175

AOC Date: 24th Jun, 2025

Amount: ₹1475000.00

View Details

Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For Use With Erc Mk -v On Wider Base Concrete Sleeper Suitable For 60 Kg Rail Confirming To Rdso Drg. No. T-6938 And T-6 939 With Latest Alterations. Irs Specification For Gfn-66 Insulating Liners Sl. No. T-44-2023 With Latest Amendment. Each Set Of One Gfn Liner To Drg. No. T-6938 And One Gfn Liner To Drg. No. T-6939 (the Alt. In Drawing And Specification Issued By Rdso Up To One Month Prior To Tender Opening Date Shall B E Applicable In This Tender) [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: NORTHERN RAILWAY

Location: Multi city, Multi State, India

ITB id: 12827176

AOC Date: 24th Jun, 2025

Amount: ₹1475118.00

View Details

Supply Of Sound Insulation Wood Panels Of Size:16x1250x3000 Mm To Rcf Specn.mdts-07 5,rev.03.please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetn Ew.php Using Key:0725c68ndnn2342. [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: INTEGRAL COACH FACTORY

Location: Chennai, Tamil Nadu, India

ITB id: 12827177

AOC Date: 24th Jun, 2025

Amount: ₹7672832.00

View Details

Supply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For The Use With Erc Mk-iii On 52 Kg Concrete Sleepers With 52 Kg Rails To Rdso Drg. No. T-3702 With Latest Alteration And As

Organization: NORTHERN RAILWAY

Location: Multi city, Multi State, India

ITB id: 12827178

AOC Date: 24th Jun, 2025

Amount: ₹9638356.34

View Details

Supply Of trimetazidine Hydrochloride 80 Mg (as Extended Release Pellets) Cap In Strip

Organization: North Frontier Railway

Location: Multi city, Multi State, India

ITB id: 12827179

AOC Date: 24th Jun, 2025

Amount: ₹1511516.16

View Details

Supply Of Green Aspect Main Led Signal 110v Ac, Retrofittable In Existing Csl Housing And Compatiable With Ac Led Ecr/ac Conventional Ecr As Per Rdso Specification No. Rdso /spn/199/2010 Rev. 1.1 Or Latest. [ Warranty Period: 60 Months After The Date Of Delivery ]

Organization: SOUTH WESTERN RAILWAY

Location: Bengaluru, Karnataka, India

ITB id: 12827180

AOC Date: 24th Jun, 2025

Amount: ₹2507353.68

View Details

Supply Of glync Yes Wled Luminaire Light Brand: Glync (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687734939678 Dt.10/01/2025)

Organization: North Eastern Railway

Location: Multi city, Multi State, India

ITB id: 12827181

AOC Date: 24th Jun, 2025

Amount: ₹590295.00

View Details

Supply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For The Use With Erc Mk-iii On 52 Kg Concrete Sleepers With 52 Kg Rails To Rdso Drg. No. T-3702 With Latest Alteration And As

Organization: NORTHERN RAILWAY

Location: Multi city, Multi State, India

ITB id: 12827182

AOC Date: 24th Jun, 2025

Amount: ₹5782981.88

View Details

Supply Of Secondary Spring For Wag9/wap7 Locos As Per Clw Specification No. Clw/ms/3/spec/eld O-bogie/004 Alt.2 And Clw Drg No.- 1209-01.015.010 Alt.2 [ Warranty Period: 30 Months After The Da Te Of Delivery ]

Organization: SOUTH WESTERN RAILWAY

Location: KRISHNARAJAPURAM, Karnataka, India

ITB id: 12827183

AOC Date: 24th Jun, 2025

Amount: ₹2533460.00

View Details

Supply Of draeger Anesthesia Workstation Brand: Draeger (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687731468992 Dt.13/03/2025)

Organization: Rail Coach Factory

Location: Multi city, Multi State, India

ITB id: 12827184

AOC Date: 24th Jun, 2025

Amount: ₹4901242.00

View Details

Supply Of Composition Brake Blocks - High Friction Brake Block For Wdg4/wdp4 Locomotives To Drg. No. Sk-dp 3630, Alt.2, Specn. No. Mp.0.0100.10 Rev 03 May 07 Or Latest. [ Warranty Period: 30 Months After T He Date Of Delivery ]

Organization: SOUTH WESTERN RAILWAY

Location: Multi city, Multi State, India

ITB id: 12827185

AOC Date: 24th Jun, 2025

Amount: ₹2208043.14

View Details

Supply Of Inj. Darbepoetin Alfa40mcg/0.4ml In Pfs ]

Organization: EAST CENTRAL RAILWAY

Location: Patna, Bihar, India

ITB id: 12827186

AOC Date: 24th Jun, 2025

Amount: ₹952217.28

View Details

Supply Of Thin Client

Organization: South Eastern Railway

Location: Ranchi, Jharkhand, India

ITB id: 12827187

AOC Date: 24th Jun, 2025

Amount: ₹3292819.50

View Details

Supply Of Electronic Rack Unit For E-70 Brake System, Ftrtil Part No.- Ft0050398-k00 For 3-phase Locomotive As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: South Eastern Railway

Location: Howrah, West Bengal, India

ITB id: 12827188

AOC Date: 24th Jun, 2025

Amount: ₹1366550.92

View Details

Supply Of Set Of Tpu Ring Consisting Of 02 Items (1). Tpu Ring Inner For Primary Suspension Drg No. C G-20049,alt-01, Item No 1, Qty. 16 Nos. (2). Tpu Ring Outer For Primary Suspension Drg No. Cg-20049, Alt- 01 Item 2, Qty 16 Nos. Matl.& Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: North Western Railway

Location: Ajmer, Rajasthan, India

ITB id: 12827189

AOC Date: 24th Jun, 2025

Amount: ₹30185226.00

View Details

Supply And Installation Of Smf Vrla 48v/200 Ah Battery Set (consisting Of 02 Volt 200 Ah Ce Ll) With All Connecting Accessories And Battery Stand As Per Rdso Specification No. Irs:s 93/96 With Amd. 1 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: South Eastern Railway

Location: Ranchi, Jharkhand, India

ITB id: 12827190

AOC Date: 24th Jun, 2025

Amount: ₹3624192.00

View Details

Supply Of Rectifier Cum Regulator Unit For 25 Kw Brushless Alternators With Over Voltage Protectio N For 110v Dc, Sgac Coaches Conforming To Rdso Specification No. Rdso/pe/spec/ac/0056-2014 (re V.1). [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: East Coast Railway

Location: Bhubaneswar, Odisha, India

ITB id: 12827191

AOC Date: 24th Jun, 2025

Amount: ₹1161120.00

View Details

Supply Of Set Of Tpu Ring Consisting Of 02 Items (1). Tpu Ring Inner For Primary Suspension Drg No. C G-20049,alt-01, Item No 1, Qty. 16 Nos. (2). Tpu Ring Outer For Primary Suspension Drg No. Cg-20049, Alt- 01 Item 2, Qty 16 Nos. Matl.& Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]

Organization: North Western Railway

Location: Ajmer, Rajasthan, India

ITB id: 12827192

AOC Date: 24th Jun, 2025

Amount: ₹20115873.00

View Details

Supply Of Srphc065181-enzalutamide 160mg Tab/cap Unit:tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 La Cs ]

Organization: Southern Railway

Location: Perambur, Tamil Nadu, India

ITB id: 12827193

AOC Date: 24th Jun, 2025

Amount: ₹1122038.40

View Details

Supply Of Bearing Assly Roller

Organization: NORTHERN RAILWAY

Location: Amritsar, Punjab, India

ITB id: 12827194

AOC Date: 24th Jun, 2025

Amount: ₹1665853.20

View Details
Scroll to Top