Tender Results
Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For Use With Erc Mk -v On Wider Base Concrete Sleeper Suitable For 60 Kg Rail Confirming To Rdso Drg. No. T-6938 And T-6 939 With Latest Alterations. Irs Specification For Gfn-66 Insulating Liners Sl. No. T-44-2023 With Latest Amendment. Each Set Of One Gfn Liner To Drg. No. T-6938 And One Gfn Liner To Drg. No. T-6939 (the Alt. In Drawing And Specification Issued By Rdso Up To One Month Prior To Tender Opening Date Shall B E Applicable In This Tender) [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12827175
AOC Date: 24th Jun, 2025
Amount: ₹1475000.00
View DetailsManufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For Use With Erc Mk -v On Wider Base Concrete Sleeper Suitable For 60 Kg Rail Confirming To Rdso Drg. No. T-6938 And T-6 939 With Latest Alterations. Irs Specification For Gfn-66 Insulating Liners Sl. No. T-44-2023 With Latest Amendment. Each Set Of One Gfn Liner To Drg. No. T-6938 And One Gfn Liner To Drg. No. T-6939 (the Alt. In Drawing And Specification Issued By Rdso Up To One Month Prior To Tender Opening Date Shall B E Applicable In This Tender) [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12827176
AOC Date: 24th Jun, 2025
Amount: ₹1475118.00
View DetailsSupply Of Sound Insulation Wood Panels Of Size:16x1250x3000 Mm To Rcf Specn.mdts-07 5,rev.03.please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetn Ew.php Using Key:0725c68ndnn2342. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
ITB id: 12827177
AOC Date: 24th Jun, 2025
Amount: ₹7672832.00
View DetailsSupply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For The Use With Erc Mk-iii On 52 Kg Concrete Sleepers With 52 Kg Rails To Rdso Drg. No. T-3702 With Latest Alteration And As
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12827178
AOC Date: 24th Jun, 2025
Amount: ₹9638356.34
View DetailsSupply Of trimetazidine Hydrochloride 80 Mg (as Extended Release Pellets) Cap In Strip
Organization: North Frontier Railway
Location: Multi city, Multi State, India
ITB id: 12827179
AOC Date: 24th Jun, 2025
Amount: ₹1511516.16
View DetailsSupply Of Green Aspect Main Led Signal 110v Ac, Retrofittable In Existing Csl Housing And Compatiable With Ac Led Ecr/ac Conventional Ecr As Per Rdso Specification No. Rdso /spn/199/2010 Rev. 1.1 Or Latest. [ Warranty Period: 60 Months After The Date Of Delivery ]
Organization: SOUTH WESTERN RAILWAY
Location: Bengaluru, Karnataka, India
ITB id: 12827180
AOC Date: 24th Jun, 2025
Amount: ₹2507353.68
View DetailsSupply Of glync Yes Wled Luminaire Light Brand: Glync (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687734939678 Dt.10/01/2025)
Organization: North Eastern Railway
Location: Multi city, Multi State, India
ITB id: 12827181
AOC Date: 24th Jun, 2025
Amount: ₹590295.00
View DetailsSupply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner For The Use With Erc Mk-iii On 52 Kg Concrete Sleepers With 52 Kg Rails To Rdso Drg. No. T-3702 With Latest Alteration And As
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12827182
AOC Date: 24th Jun, 2025
Amount: ₹5782981.88
View DetailsSupply Of Secondary Spring For Wag9/wap7 Locos As Per Clw Specification No. Clw/ms/3/spec/eld O-bogie/004 Alt.2 And Clw Drg No.- 1209-01.015.010 Alt.2 [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Organization: SOUTH WESTERN RAILWAY
Location: KRISHNARAJAPURAM, Karnataka, India
ITB id: 12827183
AOC Date: 24th Jun, 2025
Amount: ₹2533460.00
View DetailsSupply Of draeger Anesthesia Workstation Brand: Draeger (detailed Description/specification As Per Product # 1 Of Gem Contract No. Gemc-511687731468992 Dt.13/03/2025)
Organization: Rail Coach Factory
Location: Multi city, Multi State, India
ITB id: 12827184
AOC Date: 24th Jun, 2025
Amount: ₹4901242.00
View DetailsSupply Of Composition Brake Blocks - High Friction Brake Block For Wdg4/wdp4 Locomotives To Drg. No. Sk-dp 3630, Alt.2, Specn. No. Mp.0.0100.10 Rev 03 May 07 Or Latest. [ Warranty Period: 30 Months After T He Date Of Delivery ]
Organization: SOUTH WESTERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12827185
AOC Date: 24th Jun, 2025
Amount: ₹2208043.14
View DetailsSupply Of Inj. Darbepoetin Alfa40mcg/0.4ml In Pfs ]
Organization: EAST CENTRAL RAILWAY
Location: Patna, Bihar, India
ITB id: 12827186
AOC Date: 24th Jun, 2025
Amount: ₹952217.28
View DetailsSupply Of Thin Client
Organization: South Eastern Railway
Location: Ranchi, Jharkhand, India
ITB id: 12827187
AOC Date: 24th Jun, 2025
Amount: ₹3292819.50
View DetailsSupply Of Electronic Rack Unit For E-70 Brake System, Ftrtil Part No.- Ft0050398-k00 For 3-phase Locomotive As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: South Eastern Railway
Location: Howrah, West Bengal, India
ITB id: 12827188
AOC Date: 24th Jun, 2025
Amount: ₹1366550.92
View DetailsSupply Of Set Of Tpu Ring Consisting Of 02 Items (1). Tpu Ring Inner For Primary Suspension Drg No. C G-20049,alt-01, Item No 1, Qty. 16 Nos. (2). Tpu Ring Outer For Primary Suspension Drg No. Cg-20049, Alt- 01 Item 2, Qty 16 Nos. Matl.& Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: North Western Railway
Location: Ajmer, Rajasthan, India
ITB id: 12827189
AOC Date: 24th Jun, 2025
Amount: ₹30185226.00
View DetailsSupply And Installation Of Smf Vrla 48v/200 Ah Battery Set (consisting Of 02 Volt 200 Ah Ce Ll) With All Connecting Accessories And Battery Stand As Per Rdso Specification No. Irs:s 93/96 With Amd. 1 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: South Eastern Railway
Location: Ranchi, Jharkhand, India
ITB id: 12827190
AOC Date: 24th Jun, 2025
Amount: ₹3624192.00
View DetailsSupply Of Rectifier Cum Regulator Unit For 25 Kw Brushless Alternators With Over Voltage Protectio N For 110v Dc, Sgac Coaches Conforming To Rdso Specification No. Rdso/pe/spec/ac/0056-2014 (re V.1). [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: East Coast Railway
Location: Bhubaneswar, Odisha, India
ITB id: 12827191
AOC Date: 24th Jun, 2025
Amount: ₹1161120.00
View DetailsSupply Of Set Of Tpu Ring Consisting Of 02 Items (1). Tpu Ring Inner For Primary Suspension Drg No. C G-20049,alt-01, Item No 1, Qty. 16 Nos. (2). Tpu Ring Outer For Primary Suspension Drg No. Cg-20049, Alt- 01 Item 2, Qty 16 Nos. Matl.& Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: North Western Railway
Location: Ajmer, Rajasthan, India
ITB id: 12827192
AOC Date: 24th Jun, 2025
Amount: ₹20115873.00
View DetailsSupply Of Srphc065181-enzalutamide 160mg Tab/cap Unit:tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 La Cs ]
Organization: Southern Railway
Location: Perambur, Tamil Nadu, India
ITB id: 12827193
AOC Date: 24th Jun, 2025
Amount: ₹1122038.40
View DetailsSupply Of Bearing Assly Roller
Organization: NORTHERN RAILWAY
Location: Amritsar, Punjab, India
ITB id: 12827194
AOC Date: 24th Jun, 2025
Amount: ₹1665853.20
View Details
