Tenders
South Eastern Railway
Kharagpur, West Bengal, India
Supply Of Ball Joint Traction Lever. Drawing No. :fiat Drg. No.c 53973 Ref Bred 8403 Rev.- 02. Matl.& Specn :to Be Read With Technical Specn, No. 17.532 100 00, Technical Specn. No. 17 .617 100 02 And Mdts-148, Rev.-01 And Mdts-122, Rev.-03. [ Warranty Period: 30 Months After Th ...
South Central Railway
Machilipatnam, Andhra Pradesh, India
Supply Of Def (diesel Exhaust Fluid) Solution Or Aus 32 In 200 Liter Capacity Barrel/tins As Per Quality Requirement Is No. Is 17042: Part 1: 2020 (iso 22241-1), Test Method As Per Is No. Is 17042: Part 2 : 2020(iso 22241-2), Handling Transportation And Storage As Per Is No. Is 1...
Southern Railway
Erode, Tamil Nadu, India
Supply Of Pvc Grid Fixture For Holding Vertical Led Luminaries And Set Of Electrical Installation Accessories For Staff Room Faciliti Es Including Its Fitment As Per Annexure Enclosed. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Top Plate As Per Drawing Le11320, Alt No. A. [ Warranty Period: 30 Months After The Date Of Deliv Ery ]
North Western Railway
Ajmer, Rajasthan, India
Supply Of Lashing Chain To.drg. No. Wd-82054-s-14 Alt 5. Material And Specn. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Western Railway
Ajmer, Rajasthan, India
Supply Of Implant For Acl Reconstruction Set Consisting Of Tightrope Rt -1 ,biocomposite Interference Sc Rew 1, And Fiber Wire No 2 , 2 [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of M S Black Sheet 3.15 X 1250 X 2500 Mm To Specification No.is:1079/2009 Gr.hr1 Cu . Materi Al Test Certificate Required From Nabl Accreditted Lab. [ Warranty Period: 30 Months After The Date Of Deli Very ]
Rail Coach Factory
Kapurthala, Punjab, India
Supply Of Nimesulide 1% +methylsalisylate 30gm Gel In Tube ]
North Eastern Railway
IZATNAGAR, Uttar Pradesh, India
Supply Of Water Pump Kit For 1600 Hp Demu As Per Annexure B. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
IZATNAGAR, Uttar Pradesh, India
Supply Of Set Of Spare Parts For 1600 Hp Demu As Per Annexure -a Attached . [ Warranty Period: 30 Months After The Date Of Delivery ]
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply Slotted Csk Head Tapping Screw Size:st-4.2 X 32f To Specn Is:7170-2018 Bzp To Is:1573-86 Service Gr.no.2 Of Tab.2. [ Warranty Period: 30 Months After The Date Of Delive Ry ]
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply And Installation Of Body Shell Items For Lwlrrm Coaches To Drg. No. 1) Aaa10488, Alt. "c" - 2 Nos (rain Water Gutter) 2) 2 11012.0.20.110.100, Alt.'nil'-2 Nos.(rain Water G Utter) 3) Lp10107, Alt. 'nil' - 2 Nos,(sheeting) 4) Lp10136, Alt 'd' Anx-4 -1 No. (welding Parts Car...
South Central Railway
Tirupati, Andhra Pradesh, India
Shock Absorber Inter Cylinder (cylinder Intermediate) To Gabriel Part No.s-915011-7p., Warranty Period : 30 Months From The Date Of Supply As Per Irs Condition. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Hardened & Tempered Washer , Iso 7089-24-300 Hv, (surface Grinding Finish) Zinc Electropla Ted To Grade A3l Of Annex-.e Of Is:1367 (part Eleven)2002 [ Warranty Period: 30 Months After The Date Of Deliv Ery ]
South Central Railway
Tirupati, Andhra Pradesh, India
Shim For Secondary Suspension Drg No 72705001 Item No 13 ,part Drg No Aaa05152., (warranty P Eriod : Upto 30 Months From The Date Of Supply) [ Warranty Period: 30 Months After The Date Of Delivery ]

