Tenders
Northern Railway
Delhi, Delhi, India
Supply Of Ami No-2025-26 Tab Brivaracetam 50mg ]
Northern Railway
Delhi, Delhi, India
Supply Of (ami No. Gr 21 N 25) (2025-26) E/d Tobramycin 0.3% In 5ml ]
Northern Railway
Delhi, Delhi, India
Supply Of Ami 2025-26 Inj. Mixtard 30/70 3ml Pen ]
Northern Railway
Delhi, Delhi, India
Supply Of Band Master Ceremonial Stick Ashoka Lot With Rpf Logo [ Warranty Period: 30 Month S After The Date Of Delivery ]
Northern Railway
Ambala, Haryana, India
Supply Of 25 Kva Inverter
Eastern Railway
Durgapur, West Bengal, India
Supply Of Track Guide
East Coast Railway
Palasa, Andhra Pradesh, India
Supply Of Guiter
East Coast Railway
Palasa, Andhra Pradesh, India
Supply Of Scotech Block
East Coast Railway
Khurda, Odisha, India
Supply Of Water Cooler.
Rail Coach Factory
Kapurthala, Punjab, India
Supply Of Set Of Frp Side Wall Panels For Lhb Slr Hog Coaches (31-seater). Follow Col Our Shade As Per L.no. Md46271 Dated 18.01.2021., As Per Drawing: Mplsplwslrd Version 2 [ Warranty Period: 84 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Chittoor, Andhra Pradesh, India
Onsite Supply And Installation With 3 Pole Capacity
Central Railway
Bhusawal, Maharashtra, India
Drop Out Time Delay Relay For Anti-skid True Off Delay Control Supply Voltage 110-240 V Ac/d C, Place Of Installation S1k05 As Per The Switch Board Cabinet Bill Of Material Of Rdso Spec. No: Rdso/pe/s Pec/ Ac/ 0184 - 2015 (rev-1) And Rdso Lr.no. El/7.1.108/mssbc, Dt 17/09/21 To A...
North Eastern Railway
Bareilly, Uttar Pradesh, India
Supply Of Urostomy Base Plate 60 Mm Code 10522 Specn: Coloplast 10522 60mm Sensura Mio Cli Ck Baseplate, Stoma Size : 15-55mm, Opening Type : Cut-to-fit ]
South Eastern Railway
Bokaro, Jharkhand, India
Supply And Fitment Of Spare Parts For Angle Grinder And Chop Saw Metal Cutting Machine
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply Of Panel For Papis Cover In Lscn /pp To Drg No.lscn/pp (975)- 4-3-003, Al T-a, Item 1- 2 Nos, Item 2-2 Nos. Item Shall Be Powder Coated To The Colour Shade Of Acp P Anel(colour Shall Be Confirmed With Icf Design Before Manufacturing The Item). [ Warra Nty Period: 30 Months...

