Tenders

Central Railway

Mumbai, Maharashtra, India

Supply Of Air Bellow (dust Excluder) For Parking Cylinder To Drg. No. Cee/cr/emu/mtn/ac- Dc/ka/4/025. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9408
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Memu Item 1:- Double Poppet Valve, Trident Part No Ad939. Make:-"trident" [ Warranty P Eriod: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9407
₹Refer To Document
Details

East Central Railway

Dhanbad, Jharkhand, India

Supply Of Standard Calibration Gas Mixture In Canister With Nozzle, Fine Control & Gas Composition/ Gas Quality Certificate For Dga Water Capacity 0.5 Ltr. Approx Pressure 20 Kg/cm2 In Canister & Stability 12 Mon Ths. Canister Containing Ch4, C2h6, C2h4, C2h2, H2 Gas 1000 Ppm & C...
Deadline: 20th May, 2026
ITB ID: 9406
₹Refer To Document
Details

East Central Railway

Dhanbad, Jharkhand, India

Supply Of Zero Air (moisture Free) To Be Refilled In Railways Own Cylinder After Cleaning, Valve Testing An D Other Necessary Testing Of Cylinders. Cylinders To Be Lifted From Els/gmo's Store And To Be Handed Over T O Same After Refilling. [ Warranty Period: 30 Months After The D...
Deadline: 20th May, 2026
ITB ID: 9405
₹Refer To Document
Details

Central Railway

Pune, Maharashtra, India

Supply Of Hammer For Breaking Window Glass Drg. No. Rdso Sk-k3001, Alt-2, Item No 1, 2 And 3. Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9404
₹Refer To Document
Details

East Central Railway

Dhanbad, Jharkhand, India

Supply Of 1 Ml Gas Syringe Baton Rouge, La Usa. Brand:- Vici Precision Sampling Or Similar. [ Warrant Y Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9403
₹Refer To Document
Details

East Central Railway

Dhanbad, Jharkhand, India

Supply Of Ultrapure (99.997%) Nitrogen Gas To Be Refilled In Railways Own Cylinder After Cleaning Valve T Esting And Other Necessary Testing Of Cylinders. Cylinders To Be Lifted From Els/gmo,s Store And To Be Hand Ed Over To Same After Refilling. [ Warranty Period: 30 Months Afte...
Deadline: 20th May, 2026
ITB ID: 9402
₹Refer To Document
Details

East Central Railway

Dhanbad, Jharkhand, India

Supply Of Ultrapure (99.997%) Hydrogen Gas To Be Refilled In Railways Own Cylinder After Cleaning, Valv E Testing And Other Necessary Testing Of Cylinders. Cylinders To Be Lifted From Els/gmos Store And To Be Ha Nded Over To Same After Refilling. [ Warranty Period: 30 Months Afte...
Deadline: 20th May, 2026
ITB ID: 9401
₹Refer To Document
Details

Central Railway

Mumbai, Maharashtra, India

Supply Of Anti Vibration Mount For 3 Phase Main Air Compressor (agtu) Ftrtipl Make, Part No: Ft0044 122-100. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9400
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Sealed Window Glass Unit For Ac Coaches To Rcf Drg. No. Cc54208, Alt. 'd'. Matl. & Spec N. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9399
₹Refer To Document
Details

Central Railway

Pune, Maharashtra, India

Supply Of Bituminised Gunny Strips Of Width 18 Cms To Is: 702/1988 (reaffirmed In 2009) Revision 2 Amendment No.1, As Per Specifications Attached. Mtr [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9398
₹Refer To Document
Details

Central Railway

Pune, Maharashtra, India

Supply Of Frp Glass Banjo Shutter Assembly For Lavatory Window ( Colour Of Shutter Frame Shall Be "satin Blue" To Shade No.177 Of Is. 5/2007)to Drg No.rdso Sk-k 0046, Alt.1 And Rdso Specn.no.rdso/2007/cg-02 (rev.1) Feb.08 & Rdso/2007/cg-01 (rev.0) Apr.07.with Am Dt.no.01 To 02. (...
Deadline: 20th May, 2026
ITB ID: 9397
₹Refer To Document
Details

Central Railway

Pune, Maharashtra, India

Supply Of Vestibule Locking Pin Internal, Item No. 1 & 2 In Assembled Condition As Per Rcf Drg. No . Lw56359 Alt Nil. Length Of Item No. 2(chain) Should Be 20 Inches Or More. Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 20th May, 2026
ITB ID: 9396
₹Refer To Document
Details

East Central Railway

Patna, Bihar, India

Supply Of Cholesterol Kit , Specification:- 400 Test/kit, Packing Unit:- Kit Specn: Roche Cobas Integr A 400 ]
Deadline: 20th May, 2026
ITB ID: 9395
₹Refer To Document
Details

JAIL DEPARTMENT

Surajpur, Chhattisgarh, India

Supply Of Chana Dal
Deadline: 26th May, 2026
ITB ID: 9394
₹Refer To Document
Details
Scroll to Top