Tenders
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Set Of Pins And Bushes For Brake Rigging Of Wap-7 Locos Consisting Of 15 Items And Mat Erial Shall Be Manganese Steel As Per Is:276-2000 Gr.-1 (old Spec. No. Irs: R65) (1) Pins As Per Rdso %u2019s Drg. No.skvl-585(alt-2) (sheet 2 Of 3) Qty.11 Items In 104 Nos. And (2) B...
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Elbow Malleable Cast Iron Galvanised For Tube Of Nominal Bore 40mm Material : M Alliable C.i. Specn. 1879 Used For Water Pipe Fittings Of Coaches [ Warranty Period: 30 Months Afte R The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of (ph No.:06119) Cefpodoxime Proxetil 50 Mg/ 5 Ml Syp - 30 Ml ]
South Western Railway
Mysore, Karnataka, India
Supply Of Door Stopper For Lhb Coaches As Per Drg No. Mi004112 Alt 'a' [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of (ph No.:07025) Prasugrel 10 Mg Tab / Cap ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Contactor For Control Electronics On And Control Electronics Off (pos. No.126,218) Type -s--164 As Per Clw Specn. No. Clw/es/3/0034 Alt.b Of 3 Phase Locos. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Western Railway
Hubli, Karnataka, India
Supply Of Driver Display Unit, Model No. Hmi-0-10-ts Dce 4522c As Per Bt Part No. Tc3est000239-70 10 For Bt Make Propulsion Of 3 Phase Locomotives [ Warranty Period: 30 Months After The Date Of Delivery ]
South Western Railway
Hubli, Karnataka, India
Supply Of Helical Spring For Axle Box For High Capacity Parcel Van (hcpv) To Rdso Drg No. Rdso/sk-980 17 Alt.1 And Confirming To Rdso Specification No. Wd-01- Hls-94 Rev.5 Of Dec 2024 [ Warranty Period: 3 0 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Valve, Check-filter Supply To Dlw Drg.no.8366533 Alt.aa And Dlw Part No. 16240558 For The Mai Ntenance Of Hhp Diesel Locomotives. Note: As Per Blw Vendors Only Quote. [ Warranty Period: 30 Months Aft Er The Date Of Delivery ]
South Western Railway
Hubli, Karnataka, India
Supply Of Controller Pcb For 400mm Sweep Bldc Carriage Fan ?should Be Suitable For Cgl Make/brand Bldc Carriage Fans". Rdso Spec No. Rdso/pe/spec/tl/0021- 2005 [rev - 3 ]
rail wheel plant
Bengaluru, Karnataka, India
Supply Of Drag Turret Head Item No:2 To Rwf Drg No.722931010270. ]
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Set Of Gaskets For Sctmb Duct As Per Drg. No. Els/vskp/2019/15. 01 Set Consisting Of 03 Items 03 Nos.
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Heat Transfer Fluid Clariant Make Coolant (type Antifrozen-n Water Mixture 30%). [ Warranty Period: 30 Months After The Date Of Delivery ]
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Pin Flat Head Type A1 ]
North Central Railway
Kanpur, Uttar Pradesh, India
Supply Of Tab/cap. Paroxetine C.r. 12.5 Mg Per Unit (item No.1678 Of Ami 2025-26) ]

