Tenders
East Central Railway
Samastipur, Bihar, India
Supply Of Roof Destination Board [frp ]
North Eastern Railway
Gorakhpur, Uttar Pradesh, India
Supply Of Sticker For Air Brake Components As Per Drg. No.- G/sd3-1388 [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Dhanbad, Jharkhand, India
Supply Of Hydraulic Testing Of Co2 Cylinder As Per Is:7285-1 (2004). Note: (1) Empty Cylinder For Testin G Shall Be Provided By Consignee As Per Availability And Requirement, (2) All Necessary Certificate Of Statuto Ry Tests Has To Be Supplied With Cylinder By Firms, (3) The Vali...
East Central Railway
Dhanbad, Jharkhand, India
Supply Of Water Seal Arrangement Consisting 2 Item In One Set As Per Annexure For 3-phase Lo Comotives. [ Warranty Period: 30 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Dibrugarh, Assam, India
Supply Of Description, Material Spec & Drawing Of The Item Are As Under: Description: " Cover Co Mplete For Side Bearer " Drawing No: Icf/std -1-1-007,alt-f Or Latest [ Warranty Period: 30 Months A Fter The Date Of Delivery ]
Central Railway
Kalyan, Maharashtra, India
Supply Of Brake Shoe, As Per Rdso Drg No.d/bg-1753/x2,alt-8 As Per Spec.no M And C/mt D /101/2007. (pl Close Pl No:11020180) ]
North Eastern Railway
Gorakhpur, Uttar Pradesh, India
Supply Of Exhaust Fan 450 Mm, Capacitor Type, Rated Voltage 230 Volt 50 Hz, Ac Single Phas E. No. Of Blades - 04 Propeller Type Ac Ventilating Fan, Conforming To Is; 2312:1967 Or Latest, Minimum Air D Elivery (m3/h) As Per Table 2 Of Is; 2312:1967, Frame Legs Set, Rubber Clamps A...
NORTH EAST FRONTIER RAILWAY
Jalpaiguri, West Bengal, India
Supply Of Portable Rly. Control Telephone,2w/4w As Per Spec. No.irs:tc-75/99 Amd.4 Or Latest. [ W Arranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Dhanbad, Jharkhand, India
Supply Of Net For Oil Cooling Filter Of Wag-9 Locomotive. As Per Drg. No. Trs/gmo/g-1/g-9/025. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Gondal, Gujarat, India
Supply Of Pin Code Lock With Catch , Nut Attachment And Straight Locking Cam Latch Length 40 Mm (+/- 2mm) [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Seamless Stainless Steel Pipe 48.26 X 3.68 X 90, As Per Drawing: Lg63129 Alt H Item 7, Packing Instruction: Items Should Be Individually Wrapped With Paper And Collecti Vely Packed In Card Board Box Having Sufficient Strength, Further Tied With Suitable Ny Lon Strips...
East Central Railway
Samastipur, Bihar, India
Supply Of Hrc Fuse With Holder For Voltage Control, 1a, 1.2 Kv, M/s. Siba Cat No. 184000.1-71034 01, Hva-1(link) 4533(base) Of M/s Eaton Bussman Or Similar. Make: Siba /wohner /ferraz /eaton B Ussman Only And As Per Rdso Spec. Rdso/pe/spec/ac/0184 - 2015 (rev. 0) [ Warranty Perio...
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Tyre Solid Cushion (rear) Wide For Fork-lifter (godrej/voltas/sawraj)size 23 "odx10"idx6.5"wide, As Per Drawing: Make: Emrald, Tvs Sunbear And Goodlift Only., Quality P Lan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Square Tube 20x20x2mm, As Per Drawing: Rdso/spec.c-k201 Gr. 409m, Packing Instr Uction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During T Ransportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If A Ny , Shall Be A...
East Central Railway
Samastipur, Bihar, India
Supply Of Hbc Fuse Link 06 Amp., 415v Ac, 80ka, Clip On With Staggered Tags, Type Ns6 Conformi Ng To Iec:60269-2-1/ Is:13703/1993 [ Warranty Period: 30 Months After The Date Of Delivery ]

