Tenders
Central Railway
Kalyan, Maharashtra, India
Supply Of Syp Cefpodoxime Proxetil 50 Mg ]
Central Railway
Kalyan, Maharashtra, India
Supply Of Tab Levetiracetam 750 ]
South Central Railway
Kazipet, Telangana, India
4ml Grease Pot (box Of 1000 Nos.) For Analex Fdm Plus As Per Part No.fg-k15005-kw-kt-in Of Kittiwake Make Or Its Equivalent. Note: Sample Should Be Got Approved Before Bulk Supply. [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Kit For 1 1/4" Check Valve (rs) Of E 70 Brake System For 3 Phase Loco As Per Ftrtil Part No. -790 002 125 Consisting Of 5 Items (i) Stem Assembly, Ftrtil Part No.- 002 1212 00 Qty. 01 No. (ii ) Washer, Ftrtil Part No. 002 8255 00 Qty. 01 No. (iii) Multi Tooth Washer, Ft...
South East Central Railway
Bilaspur, Chhattisgarh, India
Supply Of Piston Screw, Part No. 2e36.48-jj , Make: Plasser [ Warranty Period: 6 Months After Th E Date Of Delivery ]
Eastern Railway
LILUAH, West Bengal, India
Supply Of Thermal Insulation For Sidewall Of Railway Coaches Size: 50 X 935 X 10 00 Mm Conforming To Rcf Specn Mdts-28001, Rev-03. In Specification Mdts-28001, Rev-05, Where Ever Cde/rcf Appears It Should Be Read As Cde/icf [ Warranty Period: 30 Months After The Date Of Delivery ...
Eastern Railway
Jamalpur, Bihar, India
Supply Of Irreversible Type Self Adhesive Temperature Sensitive Type Labels. Size 51 X 18 Mm, Temp. Ra Nge : 71 Degree Centigrade To 110 Degree Centigrade. [ Warranty Period: 30 Months After The Date Of Deli Very ]
Eastern Railway
LILUAH, West Bengal, India
Supply Of Lavatory Door Stopper As Per Drg.no. Cc63384 [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Eastern Railway
Asansol, West Bengal, India
Supply Of 36 Blade Combination Feeler Gauge, Is : 3179 :2024. Make Brand Mitutoyo ,stanley Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Jamalpur, Bihar, India
Supply Of Tmdds Bracket With Tmdd Drum As Per Drg. No. : E3/467/a/trs/asn/er . [ Warranty Perio D: 30 Months After The Date Of Delivery ]
Eastern Railway
Halisahar, West Bengal, India
Supply Of Set Of Cylindrical Roller Bearing For Bhel Tm Type 4303 By/dy And Cgl Tm Type C1005 Consisting Of (1) Bearing Nh 320/nj320-01no./set ( 2) Angle Ring Hj 320 E-01no./set. Rdso Specn No - Mp - 0.2402.03 (rev.03) April 2011& Mp- 0.2402.03 (rev 04) April 2021. [ Warranty Per...
Eastern Railway
Kolkata, West Bengal, India
Supply Of Installation And Commissioning Of Fully Automatic Computerized Rake Test Rig ( Rtr).specification As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
LILUAH, West Bengal, India
Supply Of Switch Plate Assembly Complete With Polycarbonate Cover Frame And Powder Coated Steel Pl Ate Consists Of:- (i) On-off Switch -1 No. (ii) 3 Pin Socket (6a, 250v,ac) -1 No.(iii) Glass Fuse 2a Of M/s Ferr Az Shawmut/ Cooper Bussman/ Equivalent With The Approval Of Icf/rcf/...
Eastern Railway
Kolkata, West Bengal, India
Supply Of Key Bolt With Nut, Spring Washer & 4 Dia. Split Pin. Drawing No. : Rdso's Drg. No. Sk- 69 594 Item No. 9, Alt.37 Or Latest. Material &specification: Is: 2585 -2006, (rev. -2), Is: 3063 -1994, (re V. -2) Is:549 - 2005 , (rev. -3). [ Warranty Period: 30 Months After The D...
Eastern Railway
LILUAH, West Bengal, India
Supply Of Lavatory Bowl Facing As Per Drg. No. 1.10113.0.30.095.002 Alt. A, Mdts-133 Rev-05 [ Warr Anty Period: 30 Months After The Date Of Delivery ]

