Tenders
Central Railway
Kalyan, Maharashtra, India
Supply Of Brake Shoe, As Per Rdso Drg No.d/bg-1753/x2,alt-8 As Per Spec.no M And C/mt D /101/2007. (pl Close Pl No:11020180) ]
North Eastern Railway
Gorakhpur, Uttar Pradesh, India
Supply Of Exhaust Fan 450 Mm, Capacitor Type, Rated Voltage 230 Volt 50 Hz, Ac Single Phas E. No. Of Blades - 04 Propeller Type Ac Ventilating Fan, Conforming To Is; 2312:1967 Or Latest, Minimum Air D Elivery (m3/h) As Per Table 2 Of Is; 2312:1967, Frame Legs Set, Rubber Clamps A...
NORTH EAST FRONTIER RAILWAY
Jalpaiguri, West Bengal, India
Supply Of Portable Rly. Control Telephone,2w/4w As Per Spec. No.irs:tc-75/99 Amd.4 Or Latest. [ W Arranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Dhanbad, Jharkhand, India
Supply Of Net For Oil Cooling Filter Of Wag-9 Locomotive. As Per Drg. No. Trs/gmo/g-1/g-9/025. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Gondal, Gujarat, India
Supply Of Pin Code Lock With Catch , Nut Attachment And Straight Locking Cam Latch Length 40 Mm (+/- 2mm) [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Seamless Stainless Steel Pipe 48.26 X 3.68 X 90, As Per Drawing: Lg63129 Alt H Item 7, Packing Instruction: Items Should Be Individually Wrapped With Paper And Collecti Vely Packed In Card Board Box Having Sufficient Strength, Further Tied With Suitable Ny Lon Strips...
East Central Railway
Samastipur, Bihar, India
Supply Of Hrc Fuse With Holder For Voltage Control, 1a, 1.2 Kv, M/s. Siba Cat No. 184000.1-71034 01, Hva-1(link) 4533(base) Of M/s Eaton Bussman Or Similar. Make: Siba /wohner /ferraz /eaton B Ussman Only And As Per Rdso Spec. Rdso/pe/spec/ac/0184 - 2015 (rev. 0) [ Warranty Perio...
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Tyre Solid Cushion (rear) Wide For Fork-lifter (godrej/voltas/sawraj)size 23 "odx10"idx6.5"wide, As Per Drawing: Make: Emrald, Tvs Sunbear And Goodlift Only., Quality P Lan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Square Tube 20x20x2mm, As Per Drawing: Rdso/spec.c-k201 Gr. 409m, Packing Instr Uction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During T Ransportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If A Ny , Shall Be A...
East Central Railway
Samastipur, Bihar, India
Supply Of Hbc Fuse Link 06 Amp., 415v Ac, 80ka, Clip On With Staggered Tags, Type Ns6 Conformi Ng To Iec:60269-2-1/ Is:13703/1993 [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Begusarai, Bihar, India
Supply Of Hrc Fuse 40 Amp., 415 V Ac, Size-a3 Off Set Tag Type, Breaking Capacity- 80 Ka, To Iec :60269-2-1/ Is:13703-1993, Siemens's. 3nw Tis40 Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ]
Directorate Local Bodies
Tonk, Rajasthan, India
Construction Of C.c. From Kailash Jats House To Chiranji Lal And Shankars House In Khajla Ki Dhani
Karnataka Forest Department
Tiptur, Karnataka, India
Providing Man Power Of 04 Light Vehicle Drivers For Tiptur Sub-division, Tiptur During 2025-26 (outsource)
Karnataka State Road Transport Corporation
Bangalore, Karnataka, India
Mrbs, Stall No-11 & 12,(built Up),general Stall, 220 Sqft,5 Years, Elf Rs 19,679/-, Emd Rs 58,537/-
North Eastern Railway
Gonda, Uttar Pradesh, India
Supply Of Auxillary Cam Switch Complete As Per Bt Pt. No. A- 6331 & Drg. No. Am 400660 R1 Or Aa L Pt. No. M- 6331 & Drg. No. 9910383855002. [ Warranty Period: 30 Months After The Date Of Deliver Y ]

