Tenders
West Central Railway
Bhopal, Madhya Pradesh, India
Supply Of Shellac Jointing Compound As Per Is: 3447/1993 (in 1/2 Kg. Packing) Manufactu Ring & Expiry Date Should Be Mentioned On Each Pack, Make- Holdtite Of M/s Pidilite, Locti Te Of M/s Henkal Or Similar To Above Brand. [ Warranty Period: 30 Months After The Date Of Deli Very ...
West Central Railway
Kota, Rajasthan, India
Supply Of Ltm 50 Lh Lyse 1 X 100 Ml Make: Sigma (bc5130) ]
West Central Railway
Halol, Gujarat, India
Supply Of Hydroxyzine 10 Mgg/5 Ml 100 Ml Syrup [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
West Central Railway
Halol, Gujarat, India
Supply Of Non Absorbable 5 Mm Strap Fixation Device For Hernia Mesh, Length Of Shaft: 35.5 Cm, Helical & Titanium Tack Single Use(30 Tac K Configuration) ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Valve Complete Mg 6/6 A For N32 Tap Changer For Conventional Loco As Per M/s Repl Pt . No. A-32 Or Rdso Drg No Skel-4633 Alt-1. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Kharagpur, West Bengal, India
Manufacturing And Supply Of Pre-stressed Mono Block Concrete Sleeper (pre-tensioned T Ype) For Broad Gauge(1673mm) As Per Rdso Design For 1 In 8.5 Derailing Switch (sets) To Rdso Drawi Ng No. Rdso/t-6068, With Latest Alteration To Irs Specification No. Irs T-45 , March 2021 , Cor...
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Kit For Brake Gear Bushes For Bogie Mounted Air Brake Coaches. Consisting Of 4 Bushes Including Equalising Stay Bush. 1) Bush 42x32x20 Mm Drg. It.2 Of Sk-81039, Alt. 15 Qty/kit-120 Nos. 2) Bush 42x32x32 Mm Drg It.3 Of Sk-81039, Alt.15 Qty/kit-84nos. 3) Bush 32 X23x20 Mm...
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Equalizer Beam Long To Drg. No. Clw/01/3/15/48, Alt-6, Ref-1, 3, 5. [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Pillar, As Per Drawing: 2 10113.1.20.112.121, Packing Instruction: No Special Packin G Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are T O Be Protected With Suitable Covering To Prevent It From Damage. However Transit Dam Age If Any Sh...
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Bearing Bracket And Lower/upper Bush ( In Assly Condition ) For Schaku Se Mi Permanent Coupler, As Per Drawing: 40-588-07(2) Item No. 3,4 & 10 Or Rdso Approved Dra Wing, Packing Instruction: Wooden Box [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Halol, Gujarat, India
Supply Of Vitamin E 200 Mg + Levocarnitine 150 Mg Tablet [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Sealed Window Glass Unit(4'-00" Wide)to Drg.no.icf/sk-5-4-230 Col.i Alt.' F '/nil And To Specification No. Icf/md/spec-103 Issue Status 01 Rev.05 With Amendment No.05 Of Sep'2020. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Pillar, As Per Drawing: Lw14111 Alt. 'f', Packing Instruction: No Special Packing Re Quired. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage I F Any Shall B...
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Brake Shoe As Per Rdso Drg.no. D/bg/1753/alt-8.as Per Spec No. M And C /mtd/101/2007 (50 Mm). [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Jabalpur, Madhya Pradesh, India
Supply Of Tab. Pentosan Polysulphate Sodium 100mg ]

