Tenders
South Central Railway
Vijayawada, Andhra Pradesh, India
Supply Of Driver Brake Controller(a-9) As Per Ftrtipl Part No.034001000 Of E-70 Air Brake S Ystem. [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tambaram, Tamil Nadu, India
Supply Of Rust Release Penetrate Spray, Size 500 Ml In Spray Bottle Similar To Wd 40 In Aerosol . ]
Central Railway
Bhusawal, Maharashtra, India
Supply Of Set Of Gaskets For Smoothing Reactor Blower (mvsl) And Cp Flange Gasket To Drg No. Clw/05/4/32/10 Alt-7. Qty=2 Nos.& Drg No Elw/bsl/3/f84.032 Alt-3 Ref-3 Qty=3 Nos. (o Ne Set Consists Of 02 Items =5 Nos. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Bhusawal, Maharashtra, India
Supply, Installations & Commissioning Of Blower Motor With Impeller As Per Spec - 1 Kw, 1.3 Hp, 110 Volt, Axial Type, 2000 Rpm, 10 Amp Current, 3 Mm Impeller Dia, Air Delivery 08 Cubic Meter/sec 45 Ftp, Wt 57 Kg As Per Spec. No. Cee101028 Make - Bhel [ Warranty Period: 12 Months ...
East Central Railway
Danapur, Bihar, India
Supply Of Set Of Spare Items For Automatic Plug Door System Of Tejas Coaches, Item- (1) Relay Module 2 Nc/4s (guard Panel Relay) Kbi Part No. N72590, Qty- 10 Nos. (2) Left Rolling Arm Kbi Part No. 3td90530r3 0, Qty- 02 Nos. (3) Right Rolling Arm Kbi Part No. 3td90530r04, Qty- 02 ...
Central Railway
Mumbai, Maharashtra, India
Station Name Plate A & B For Sge D/l B/i As Per Drg. No S&t/by-sge/06, Sample To Be Appr Oved Before Bulk Supply. Party To Submit Oem/autherisation & Test Certificate Along With Supply The Materi Al. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of :hanger For Bolster Spring Suspension To Icf Drg. No. T-0-5-639 Alt-g/11. Material And Specn: Rdso Spec. No.c-k105, Rev.1, Amdt. No.1 Of Dec.2016. [ Warranty Period: 3 0 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Supply Of Set Of Cable Tie Rod For Memu/tc 3 Phase Coach, As Per Drawing: Mp3phtierod Version 4, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Da...
Central Railway
Kalyan, Maharashtra, India
Supply Of Rubber Support For Secondary Spring Of Wap-5 Loco As Per Abb Id No Ia 016000 08 Rev 3(item Is Reserved For Clw Approved Sources Only) ]
North Eastern Railway
Varanasi, Uttar Pradesh, India
Supply Of Modifed Rail Base Clamp For Fitting Rx/tx Coils Along With Acessories As Per G. G. Tronics Make Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply Of Hex Thin Nut (chamfered) M16 To Is:1364(part-4) 2003 To Mat Specis:136 7 (part-14)84, A2-70. [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Jabalpur, Madhya Pradesh, India
Supply Of M-12 (aoh) Kit For Trident Make Air Dryer To Model No. Ld2000122 For Ac Locomotive Type Wag-5/wag-7. Each Set Consisting Of 6 Items As Per Annexure. [ Warranty Period: 30 Months After The D Ate Of Delivery ]
West Central Railway
Bhopal, Madhya Pradesh, India
Supply Of Hose Pipe Coupling Assembly For Brake Pipe To Rdso Drg. No.sk-73547 Alt.12 Or Latest And Rdso Spec No. 02abr02 With Amendment No.1 And Apendix-f As Per Drg.no. Sk-735 47 Alt. 12 Or Latest Specn: 02abr02 With Amendment No. 1 And Apendix-f [ Warranty Period: 3 0 Months Af...
West Central Railway
Jabalpur, Madhya Pradesh, India
Supply Of Ptfe Sheet Roll, Size: 300mm X 1000mm X 0.5mm As Per Is 14635 For Insulation Pur Pose Of Electrical Equipments. [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Bhopal, Madhya Pradesh, India
Supply Of Male Elbow Connector 1/2"odx1/2"bspt(m) With Double Ferrule, As Per Drawing: Icf /std-3-5-023 Alt.'j' Item 6, Packing Instruction: Packing As Per Standard Packing. [ Warranty Period: 30 Months After The Date Of Delivery ]

