Tenders
Rail Coach Factory
Kapurthala, Punjab, India
Supply Of Pu Paints For Lhb Type Power Car Coaches, As Per Drawing/specification: Mplpul Hbpc2013 Version 7. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Kanakapura, Karnataka, India
Fully Assembled Fiat Bogie With 160 Kn Air Suspension For Amrit Bharat Nac Coaches As Per Mdts-20322 Rev-'02'. Railway Free Supply Items (to Be Collected By The Ve Ndor From Rcf) As Per Para 2.2 & 2.3 Of Mdts -20322 Rev-'02', As Per Drawing: Lg00005 Alt.'a' & Mdts-20322 Rev-'02' ...
Western Railway
Bhavnagar, Gujarat, India
Supply Of Paint Ready Mixed, Brushing, Bituminous Black, Acid, Alkali, Water And Chlorine Resisting Conforming To Is 9862/2017 (first Revision) With Additional Requirements Of Icf/md/spec.-052 Issue St Atus: 02, Rev. No.-01 Dt.26/05/2006. As Per Drg.no. Nil Specn: Is 158-1965 Pac...
Western Railway
Multi city, Multi State, India
Supply Of Ms Screw Combo Drive (phillips/slotted) Head Size:-50mmx10mm Accepted Deviation: Pan Head Self Tapping Screw, Single Slotted On Top [ Warranty Period: 12 Months After The Date Of Del Ivery ]
Western Railway
Multi city, Multi State, India
Toughened Safety Glass (medium Brown) & Glass Wiper With Lock As Per Drg No L J54109 Alt A & Lj54113 Alt Nil & Lock As Per Item No 5 Of Drg No Lj54110 Alt A (fitted On Glass). Note= Sample To Approve Before Bulk Supply. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Auto Drain Valve For E-70 Brake System Of Wap-7 & Wag-9 (3 Phase) Class Of Lo Cos Conforming To Clw Specn No. Clw/ms/3/001 Alt. 17 [item Sl No. 39 ]
Central Railway
Kurla, Maharashtra, India
Supply Of Dye Penentrat Test Kit To Is 3658, 12889-2018, Group Each Kit Consist Of Dye Penentrat,non A Queous Developer & Penetrant Remover (solvent)supplied In Aerosole Can In The Rato 1:3:2 Can Size Is 500 M L Each [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Kurla, Maharashtra, India
Supply Of Gasket In Take Discharge For Compressor Exhauster To C.rly. Drg. No. Ci/cr-84 Alt.4 . Not E: This Item Is Restricted To Dlw Approved Sources Only. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Kurla, Maharashtra, India
Supply Of Bearing Nu310 For Auxiliary Generator And Exciter Generator Of Alco Locomoti Ves Make- Skf, Fag, Ntn Only. Material To Be Procured From Oem Or Its Authorised Dealer Onl Y. Hsn Code-84821090. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Samastipur, Bihar, India
Supply Of Programme Switch Huba Type 138x24 M/s Siemens Type K138x224a-0067-16013 Lao-2 50-2yw/017w/3-p- 0001-0106-910-016. [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Itarsi, Madhya Pradesh, India
Supply Of Relay (gp-3 Pole) To Dlw Part No. 18180012, Drg.no. 8357415 Alt.ka. Or Its Equivalent M Edha Part No.sp696131001 [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Itarsi, Madhya Pradesh, India
Supply Of Magnet Valve Complete (metal Seated) Drg No.15880530004v00 Acs 2201/a043 [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Itarsi, Madhya Pradesh, India
Supply Of Paint Enamel Synthetic Finishing Sky Blue Isc 101 To Is 2932,packing In 20 Ltrs, New Non-returnable M.s Drum To Is:2552/89. Gr.b-ii. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
West Central Railway
Itarsi, Madhya Pradesh, India
Supply Of Paint Enamel Synthetic Traffic Green Exterior Finishing To Isc:267 To Icf/md/spec/045 Iss Ue Status 02 Rev. 03 Except Clause C3 Of Is:8662/2004 Packing In 20 Ltrs. New Non-returnable M.s. Dru Ms To Is:2552/89 Gr. B-ii. [ Warranty Period: 30 Months After The Date Of Deli...
Eastern Railway
Jamalpur, Bihar, India
Supply Of Heat Shrink Tube Reference Chart No.40027278 Alt.- Aka As Per Drg. No.400277 08 Altb Specn:wdg4/el/ps/11 Rev3.0 [ Warranty Period: 30 Months After The Date Of Delivery ]

