Tenders
Western Railway
Ahmedabad, Gujarat, India
Supply Of Door Hinge Straight (long) For Boxn Wagon To Rdso Drg. No. Wd-93067-s-01, Alt-1 And Material Conforming To Is: 2062-2011, With Amendment No. 1 Of Nov. 2012, Grade: E 250 A Is Also Acc Eptable. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Western Railway
Ajmer, Rajasthan, India
Supply Of Lead Acid Diesel Locomotive Starter Batteries Of 24v/290 Ah [comprising Of 03 Nos. Of 8v/29 0 Ah ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Hq _ Med _ Zrc (ph No.:03018) Glucosamine Sulphate 500 Mg+ Chondroitin Sul Phate 400 Mg Tab/cap ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Poh Kit For Elgi Make Compressor Type Rr20100 Cg(m) As Per Elgi Part No. 07249326 9 Consisting Of 78 Items (annexure Attached) Suitable For Wag-9/wap-7/wap-5 Locomotives. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Patiala, Punjab, India
Supply Of Pin Electroplated To Drg. No. Emu/m-3-2-065 Item No. 7 Alt.-a. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]
North Western Railway
Ajmer, Rajasthan, India
Supply Of Emergency Openable Window For Non Ac Coaches To Icf Drg. No. Icf/std-5-4-005 Alt. N, Col- Iii, Item.-5 To 11 . Matl.&spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Bokaro, Jharkhand, India
Supply Of Oil Cooler Radiator For Converter /transformer As Per Clw's Spec.no.-clw/es/3/0102 ( Alt .-e Or Latest). [ Warranty Period: 60 Months After The Date Of Delivery ]
South Eastern Railway
Kharagpur, West Bengal, India
Supply Of Bogie End Pull Rod For Casnub Bogie. Drawing No. : Rdsos Drg. No. Sk-69597, Alt. 43 , I Tem No. 2. Material And Specification : Is: 2062: 2011(rev. 7), Amend. No. 1 Of Nov. 2012, Gr. E 250 A. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Bokaro, Jharkhand, India
Supply Of Main Compressor (oil Lubricated) Including Motor With Mounting Accessories For Wag9 T Ype Electric Locomotive As Per Rdso's Spec. No.- Rdso/2018/el/spec/0137(rev.-0 Or Latest) [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Supply Of Socket Set 1/4-inch Square Drive 46 Pieces Hsn-8204 Make- Mti-568-514, Kennedyts46 Ma, Stanley Stmt72794-8, Deneers Dn 2462(1/4). Oem/oem Authorization Certificate Is Required. [war Ranty Period: 12 Months After The Date Of Delivery" [ Warranty Period: 12 Months After T...
Central Railway
Kalyan, Maharashtra, India
Supply Of Pivot Wear Plate To Drg.no.els/kyn/wcam-3/3/m-212 R1 [ Warranty Period: 30 Mon Ths After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Set Of Spare Parts For Roof Mounted Cab Ac Unit Of Wag9hc Locomotive As Per Rdso Specific Ation No.rdso/2007/el/spec/0055(rev-2) Or Latest. A Set Consists Of 5 Items (total 60 Nos) As Per Theannex Ure Attached.note: 1) Item Should Be Suitable For 2t Capacity Roof Mounted Cab Ac M...
Central Railway
Pune, Maharashtra, India
Supply Of Clamp Assembly For 1 1/4" Pipe To Dlw Drg. No. Tpl- 0007 Alt-e . The Material To Be Pr Ocured From Past Proven Sources Of Indian Railway. [ Warranty Period: 30 Months After The Date Of Deliver Y ]
Eastern Railway
Howrah, West Bengal, India
Supply Of Form No. St-5. Advance Statement Of Gross Earning And Traffic Handled,1)unit-number O F Copies, 2)size-305x430mm, Plus/minus 5mm, 3)printing Paper- White Map Litho 60 Gsm, I.s No. 1848/ 2018 Or Latest Amendment . 4)printing- Both Side In Black Ink, 5)sample:- One Sample...
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Insulated Plate Complete (upper) For N 32 Tap Changer For Conventional Loco. As Per M/ S. Repl Pt. No.: S-2114 Or M/s. Ae Pt. No.: G-2114 Or Rdso Drg. No.: Skel-4637 Alt-1. [ Warranty Per Iod: 30 Months After The Date Of Delivery ]

