Tenders

Eastern Railway

LILUAH, West Bengal, India

Supply Of Led Light Fitting For Doorway/gangway Area For Lhb Type Ac Coaches Type- N(9 Watt),co Nforming To Rdso Specn. No.rdso/pe/spec/tl/0091-2016 (rev-1),rcf Annexure-1,2,3 And As Per Rc F Drawing No. Lw-76099 (alt-b). [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 9th Jun, 2026
ITB ID: 99974
₹Refer To Document
Details

South Eastern Railway

Howrah, West Bengal, India

Supply Of Wheel Set Earthing Equipment Etc. Details As Per Annexure-1. [ Warranty Period: 30 M Onths After The Date Of Delivery ]
Deadline: 9th Jun, 2026
ITB ID: 99973
₹Refer To Document
Details

North Western Railway

Ajmer, Rajasthan, India

Supply Of Hex Head Bolt M24x150 High Tensile As Per Is:1364 ( Pt.-1 )/2023, Ce-with Property Class-10 .9 To Is:1367 ( Pt.-3 )/2017, Rev-5,coating As Per Mdts-057. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Deadline: 9th Jun, 2026
ITB ID: 99972
₹Refer To Document
Details

North Western Railway

Ajmer, Rajasthan, India

Supply Of One Set Of Double Ferrule Fittings Required For Lhb Coaches Consisting Of Following (1) Male E Lbow Connector (with Conical Seating) To Drg. No. Icf/std-3-5-137 Alt. Nil, Item-1, Qty.4 Nos. Per Set (2) B Ulk Head Male Connector (with Conical Seating) To Drg. No. Lwscwac...
Deadline: 10th Jun, 2026
ITB ID: 99971
₹Refer To Document
Details

North Western Railway

Ajmer, Rajasthan, India

Supply Of Double Inlet Centrifugal Blower, Complete With Fan Motor 415v+/-10%, 3 Phase , Sweep -133mm, 1500 Rpm, Minimum Air Volume Cmh -625, Input Power (max) -200w, Nominal Cu Rrent 0.4amp, Noise Level 60db, Ip-44, Suitable For Use As Exhaust Fan In Lhb Type Ac Coaches, Confirm...
Deadline: 10th Jun, 2026
ITB ID: 99970
₹Refer To Document
Details

South Central Railway

Tirupati, Andhra Pradesh, India

Supply Of Levelling Valve Complete Conforming To Rdso Spec No. C- K407, Rev. 04 To Rdso Drg No : Sk- K1049 Alt:2 [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 21st May, 2026
ITB ID: 99969
₹Refer To Document
Details

East Coast Railway

Visakhapatnam, Andhra Pradesh, India

Supply Of Fuel Pump Dlw Part No : 17454633 Alt-f. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 21st May, 2026
ITB ID: 99968
₹Refer To Document
Details

South Central Railway

Hyderabad, Telangana, India

Supply Of Hq_med_zrc_ (ph No:10027) Insulin Glargine Monocomponent 100 Iu/ml - 10 Ml Vial Inj. ]
Deadline: 22nd May, 2026
ITB ID: 99967
₹Refer To Document
Details

South Central Railway

Hyderabad, Telangana, India

Supply Of Hq _ Med _ Zrc _ (ph No:309900) Urea Reagent Test Auto Analyser ]
Deadline: 22nd May, 2026
ITB ID: 99966
₹Refer To Document
Details

Southern Railway

Chennai, Tamil Nadu, India

Supply Of Set Of Cylindrical Roller Bearing For Three Phase Traction Motor , Type 6fxa7059 Of Wap-5 Loco To Be Suppliued Along With Thrust Collar Hj 219 As Per Abb Product No. 3ehm 620747 Po 237(1) De Side Bearing Nu 224 C-4 As Per Abb Product No. 3ehm 620747 P0241 Of Nu224-e-xl-...
Deadline: 22nd May, 2026
ITB ID: 99965
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Uttar Pradesh, India

Supply Of Adopter For Commode With Elliptical Bottom, Drg. No. Cc-63595, (material Used In Western Co Mmode Base Fitting) [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 22nd May, 2026
ITB ID: 99964
₹Refer To Document
Details

North Eastern Railway

Varanasi, Uttar Pradesh, India

Supply Of Tab. Nicorandil 5 Mg(each Tab/cap Contains Nicorandil 5mg Packed In Pvc/silver Foil Str Ip/bottle) ]
Deadline: 22nd May, 2026
ITB ID: 99963
₹Refer To Document
Details

Central Railway

Nashik, Maharashtra, India

Supply Of Glass Mica Glass Silicon Sheet 15 Mil (0.375mm)as Per Specn.no.4tmw/spec/050 Alt-1 [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 22nd May, 2026
ITB ID: 99962
₹Refer To Document
Details

Central Railway

Nashik, Maharashtra, India

Supply Of Set Of Cross Bar Assembly For Smoothing Reactor Sl-30/42, One Set Consists O F 02 Assembly 04 Nos. (1) Clw Drg. No. 2twd.073.020 Alt-15 Ref. 1 To 7 Qty-02 Nos. (2) Clw Drg . No. 2twd.073.021 Alt.17 Ref. 1 To 8 Qty-02 Nos. [ Warranty Period: 30 Months After The Date Of D...
Deadline: 22nd May, 2026
ITB ID: 99961
₹Refer To Document
Details

Central Railway

Mumbai, Maharashtra, India

Supply Of Foot Step Complete As Per Rcf Drg. No. Cc24112 Alt-b Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 22nd May, 2026
ITB ID: 99960
₹Refer To Document
Details
Scroll to Top