Tenders

Northern Railway

Varanasi, Uttar Pradesh, India

Supply Of Un-insulated Cadmium Copper Catenary Wire 125 Sq.mm2 (37/2.10 Mm) As Per Rdso Specn . No. Ti/spc/ohe/cat (cu-cd) 0971, Str No. Ti/str/020 Rev.2 [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Deadline: 13th May, 2026
ITB ID: 100154
₹Refer To Document
Details

Northern Railway

Jalpaiguri, West Bengal, India

Supply Of Enamel Synthetic, Exterior, Undercoating, White. Specification:- Is 8662:2024 (third Re Vision) Along With Rdso Amendment No. 1a(rev.1.0) As An Additional Requirement. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max ...
Deadline: 13th May, 2026
ITB ID: 100153
₹Refer To Document
Details

Western Railway

Ratlam, Madhya Pradesh, India

Supply Of Main Door Top Shutter Toughened Glass As Per Irs Drawing No.aaa53049 Fo R Lhb Non-ac Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 13th May, 2026
ITB ID: 100152
₹Refer To Document
Details

Western Railway

Valsad, Gujarat, India

Blower Motor, Kw: 0.12 /hp : 0.16, Rpm: 1325, Frame : 63, Voltage : 415 +/- 10 % , Class H, Amp : 06 Amp. Rcf Approved Make : Star/lhp/kip Only For Use In Roof Mounted Air Conditioned Package Uni Ts (rmpu) Of 3 Phase Locos. Note: One Sample To Be Got Approved Before Bulk Supply. ...
Deadline: 13th May, 2026
ITB ID: 100151
₹Refer To Document
Details

Western Railway

Rajkot, Gujarat, India

Supply Of Set Of Stainless Steel Blower Runner, Size: 250 Mm X 100 Mm Suitable For Leel/fedders Lloyd Make Lhb Rmpu A.c. Coaches. Ma Ke: Blowtech/ Fedders Lloyd/leel Only (one Set Contains One Left And One Right Side Runner) [ Warranty Period: 30 Months After The Date Of Delivery...
Deadline: 13th May, 2026
ITB ID: 100150
₹Refer To Document
Details

Central Railway

Mumbai, Maharashtra, India

Supply Of Light Weight Lithium Battery Tamping Machine One Set Containing 2 Nos Of Tampers. [ Warr Anty Period: 12 Months After The Date Of Delivery ]
Deadline: 13th May, 2026
ITB ID: 100149
₹Refer To Document
Details

Central Railway

Amravati, Maharashtra, India

Supply Of Indicator For El-60 Valve (apm Device) Having Kbi Part. No. 771071, Conforming To Rdso Spe Cification No. Wd-23-bmbs-2008 (rev. 1) With Amend.1 Of Sept. 2016 And Drg No. Wd-08096-s-1 Alt.1. [ W Arranty Period: 30 Months After The Date Of Delivery ]
Deadline: 13th May, 2026
ITB ID: 100148
₹Refer To Document
Details

Central Railway

Amravati, Maharashtra, India

Supply Of Mandatory Kit For Slack Adjuster Irsa-600 Type Consisting Of 8 Items To Rds O Dr G. No. Wd-82064-s-01-rc, Alt-12, Item No. 2,4,6,18,25,27,34 And 43. Item No. 2,18 & 43 Qty- 02 Nos. Each, Item No. 4,6,25,27 & 34-qty-01 No. Each. Material Confirm To Rdso Spec. 07- Abr-199...
Deadline: 13th May, 2026
ITB ID: 100147
₹Refer To Document
Details

Central Railway

Mumbai, Maharashtra, India

Supply Of Balance Draft Gear For Cbc To Escort Drg No. Sk1550, Alt -2, Rdso Spec. Rdso/2011/ Cg-03 R Ev-3. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 13th May, 2026
ITB ID: 100146
₹Refer To Document
Details

Southern Railway

Erode, Tamil Nadu, India

Supply Of Qvrf Relay Switzer Make Model Gm 021-00- Bd-5-z (-2.5 To 2.5m Bar) Or Dwyer Model 1910-1 (0.40 To 1.6 Inch Wc) Or Eversure Make Diaphragm Type With Snap Action Mic Ro Switch As Per M/s. Eversure Drg No. Eee/afr/07. Complying To Rdso/elrs/tc/0072 - 2001 (rev-0). Technica...
Deadline: 26th May, 2026
ITB ID: 100145
₹Refer To Document
Details

South Central Railway

Vijayawada, Andhra Pradesh, India

Supply Of Uic Socket - 13 Pin [without Uic Plug ]
Deadline: 26th May, 2026
ITB ID: 100144
₹Refer To Document
Details

Rail Coach Factory

Kanakapura, Karnataka, India

Supply Of Steel Coil 3x1250mm., As Per Drawing: Is:3885(part-i): 1992 Grade-4 With Amend Ment No-1 Jan 1995. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 100143
₹Refer To Document
Details

South Central Railway

Vijayawada, Andhra Pradesh, India

Supply Of Inter Locking Lever Assembly(type-i) For Master Controller As Per Drg. No. B/trs/cont/3/4, Ref. Nos. 01 To 06 Or Latest If Any. Quantities For Reference Items To Be Supplied As Mentioned In The Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 100142
₹Refer To Document
Details

South Central Railway

Vijayawada, Andhra Pradesh, India

Supply Of Connector Female Assembly Suitable To Iv Coupler & Zs Coupling Socket For Control As Per M/s. S Internationals Part No. Si/ Lhb/ Csa/suba-07 Or Its Equivalent Confirming To Rdso Specification No. R Dso/pe/spec/ac/0177 (rev.'1' Or Latest) 2013. [ Warranty Period: 30 Mont...
Deadline: 26th May, 2026
ITB ID: 100141
₹Refer To Document
Details

Southern Railway

Chennai, Tamil Nadu, India

Supply Of Automated & Computerized Air Spring Suspension Components (levelling Valve And Duplex Valve) Test Bench As Per Specification Enclosed. [ Warranty Period: 24 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 100140
₹Refer To Document
Details
Scroll to Top