Tenders
North Western Railway
Ajmer, Rajasthan, India
Supply Of Snack Table Assembly For Lhb Ac 3 Tier Economy Coaches. Colour Shade Is Ivory With Granu Lar, Asper Drawing: Ed64004 Alt B. ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Circuit Module - Diode Input Panel To Emd Part No. 40028426 Alt-a To Dlw Part No. 18000125 For Hhp Locomotives. [ Warranty Period: 30 M Onths After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Transducer Current Itcc 1 And 2 To Emd Part No. 40046385 Rev.c And To Dlw Part No. 18160025 For Wdp4/wdg4 Locos. [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Nagpur, Maharashtra, India
Supply Of Set Of Gasket For Air Compressor Rr80101 (set Consisting Of 11 Nos. Gasket) For Wdg3a Locomotives As Per Enclosed Annexure - A [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Gear Lower Idler To Dlw Drg No. 9543203 Alt Aa And To Dlw Part No. 16141210 For Hhp Locos. [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Overhauling Kit For Analog Converter (774009) For Ccb-1.5 System Of Diesel Locomotive. One Set Consisting Of 11 Items. Item Detail As Per Kbi A Nnexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Bearing Inner Diameter Measurement System [ Warranty Period: 24 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Dynamic Breaking Grid Non Fan Tap To Dlw Drg. No.10634215 , Alt. Da , Dlw Pt. No. 18250038, Specification No.mp.str.em-02.02.12 (re V.01) July- 2015, Edps- 498 , Alt. "nil" & Wdg4/el/ps-09, Rev. "r1" [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Kapton Polymide Film Covered Copper Conductor, Bare Copper Size 5.6 Mm X 2.65 Mm. After Heating Sealing With 2/3 Rd Overlap (67 % To 70 %) Overall Size 5.83 Mm X 2.88 Mm With Permissible Tolerance And Generally Conforming To Rdso Specn.no. Mp.0.2400.24 (rev.02) Feb-2008...
Southern Railway
Tiruchirappalli, Tamil Nadu, India
Supply Of Earthing Brush For 3 Phase Traction Motor Type Tme-48-45-6. Medha Part No. Sptsa0037 88p0002. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Jamalpur, Bihar, India
Supply Of Hanger For Pull Rod Roller To Irs Drg. No. W/bg-6350, Alt No. Nil. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]
Western Railway
Multi city, Multi State, India
Provision Of Flameless Cooking Arrangement In Ac Ra Coaches Available In All The Divisions Of Western Railway As Per Scope Of Work & Schedule Of Rates. Qty: 20 Ra Ac Coaches.
Indian Railway
Ratnagiri, Maharashtra, India
Supply Of 60 Kg Psc Sleeper (rt-8746) Wider Prestressed Concrete Sleeper For 25t Axle Load For 5 2kg And 60kg (uic) Rails [ Warranty Period: 30 Months After The Date Of Delivery ]
Jodhpur Development Authority
Jodhpur, Rajasthan, India
नगर निगम दक्षिण वार्ड संख्या-30 में विभिन्न स्थानों पर सीवरेज लाईन बिछाने एवं सी.सी. सड़क निर्माण कार्य। -laying Of ...
Gujarat State Electricity Corporation Limited
Kheda, Gujarat, India
Supply Of Hose Pipe And Expansion Joint For Wagon Tippler And It S Side Arm Charger Installed In Chp Of 800 Mw Unit-8 Of Wtps.

