Tenders
North Eastern Railway
Bareilly, Uttar Pradesh, India
Supply Of Double Stage Regulator With Flow Meter, Type Of Gas Co2, Max. Inlet Pressure (bar) - 20 0, Flow : Lit/min 35 Ft. 3/h: 74, Inlet Connection : 0.860 X 14 Tpi R/h (female) Outlet Connection : 3/8" R/h (male). Doublestage Regulator With Flow Meter, Type Of Gas Co2, Max. Inl...
North Eastern Railway
Gorakhpur, Uttar Pradesh, India
Supply Of Paint Enamel Interior Finishing Middle Buff Isc No. 359 As Per Is:5/07 (reviewed In 2018) T O Rdso Specn No. M&c/pcn/120/2020 (rev.1) With Rdso Amndt. No. 1b As An Additional Requirement, Packed In 20 Ltrs. New & Sound Non Returnable M. S. Drums To Is:2552/1989 With Amn...
Central Railway
Nagpur, Maharashtra, India
Supply Of Hose For End Axle Sand Box Of 800 Mm Length For 3-phase Loco Having Flexible E Xtruded Rubber Tubing Of 8 Mm Nominal Bore For Working Pressure 10 Kg/sq Cm With Extern Al Sleeve Having Outer Wire Mesh Protection With 0.8 Mm Diameter X 8 Wire Bunching And Kni Tting As Per...
North Eastern Railway
Varanasi, Uttar Pradesh, India
Supply Of Main Compressor (oil Lubricated) For Electric Locomotive (1745 Lpm Capacity) As Per Rdso Specification No. Rdso/2018/el/spec/0137 Rev-0 & Str No.rdso/2007/el/str/0015 Rev. 1 [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Nagpur, Maharashtra, India
Supply Of Set Of Hardware Of Property Class 12.9 Only As Per Annexure Attached For 3 Ph Ase Traction Motor. As Per Is : 1354, 1367, 2262. Material To Be Procured From Clw Approved Sources Only Each Sets Consists Of 02 Items In 500 Nos. Detail As Per Annexure :- 1) Socket He Ad Ca...
North Eastern Railway
Varanasi, Uttar Pradesh, India
Supply Of Oil Pump With Motor For Transformer For Wap-7 & Wag-9 (3-phase)class Of Loco Motives. Specn/drg.no.: Clw's Specn. Clw/es/3/0106 Alt F And Rdso Specn. Rdso/spec/e- 10/3/09 ( Motor) With Amendment No. 1,2,3,4,5 & 6. [ Warranty Period: 30 Months After The Date Of Delivery ...
North Eastern Railway
Varanasi, Uttar Pradesh, India
Supply Of Machine Room Blower With Motor (wound With Corona Resistance Wire) As Per Clw's Spec. No. Clw/es/3/0020, Alt-h (for Blower) And Rdso Spec. No. E-10/3/09 (motor) Of August 1997 With Amendment 1 To 6 (for Motor) For 3 Phase Locomotives. [ Warranty Period: 30 Months After ...
South Western Railway
Bengaluru, Karnataka, India
Supply Of Sealed Glass Unit For Lhb Fixed Window To Rcf Drg No.lw54104 Alt 'g' And Specification Mdts- 089 Rev 4. [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Delhi, Delhi, India
Supply Of Ami Code 12.202 For 2025-26 Gliclazide 60 Mg. + Metformin 500 Mg, Sr Tab ]
West Central Railway
Halol, Gujarat, India
Supply Of Tacrolimus 1 Mg (tacsant 1) Capsule [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Set Of S.s Bend Pipe Consisting Of Two Items - (1) S.s Bend Pipe Assembly For Hett-5400 Kva Transformer As Per Bhel Drg. No. 34661950036 (2). S.s Elbow Pipe Assembly For Hett-5400 Kva Transformer From Rh To Top Cover As Per Bhel Drg.no.44661950085. As Per Drg.no. As Men...
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Insulated Plate For N32 Tap Changer For Conventional Loco. As Per Rdso's Specn. No.: Elrs/spec/gr/0039 ( Rev.2). [m/s.repl Pt .no.:s1509 & Drg. No : Ag-315426-p1 Or M/s. Ae's Pt.no.: G 1509 & Drg.no. : 9910383527001. ]
Eastern Railway
Halisahar, West Bengal, India
Supply Of Secondary Spring For Lhb Non-ac Coaches (inner) As Per Rcf's Drg. No. Lg05100, Alt N O. - C And Conforming To Rdso's Spec. No. Rdso/2017/cg-01 (rev - 02 ) Of February 2023. [ Warrant Y Period: 72 Months After The Date Of Delivery ]
South Eastern Railway
Howrah, West Bengal, India
Supply Of Yaw Damper For Fiat Ir Bogie Drawing No. : Rdso/cg/drg/21048, Alt.-2. Matl.& Specn : Rdso/cg-18005, Rev.-1. [ Warranty Period: 72 Months After The Date Of Delivery ]
South Eastern Railway
Sundergarh, Odisha, India
Supply Of Flow Sensor As Per Abb Pt No. 3bhe028061r0001. [ Warranty Period: 30 Months After The Date Of Delivery ]

