Tenders

Northern Railway

Delhi, Delhi, India

Supply Of A M I No- 20.19/2025-26 Inj Hepatitis B Immunoglobulin 100 Iu Per 0.5ml ]
Deadline: 26th May, 2026
ITB ID: 115841
₹Refer To Document
Details

Western Railway

Vadodara, Gujarat, India

Supply Of Draw Hook For Vvn (bg) To Irs Part Drg.no. W/bd-445, Alt-5. Material To Is: 1875-19 92, Latest Amend.2 Of Nov.1994 (reaffirmed-2004) Is: 2004 1991 & (reaffirmed-2001), R-11-19 67, With Corrigendum No. 1 Of Oct. 1975" [ Warranty Period: 30 Months After The Date Of Delive...
Deadline: 26th May, 2026
ITB ID: 115840
₹Refer To Document
Details

Northern Railway

Lucknow, Uttar Pradesh, India

Supply Of Ioh Maintenance Kit (sub Kit Ioh-1) Of 113 Common Items For No 32 Tap Change R Of M/s Repl (bt Type) Or M/s Aal (ganz Type) As Per Annexure- R1& Annexureioh- Hw-1 Of Rdso Technical Circular No. Rdso/2010/el/tc/0102 Rev. 1 Dated 16.09.2016 With Amendmen T No. 1 As Per Rd...
Deadline: 26th May, 2026
ITB ID: 115839
₹Refer To Document
Details

Central Railway

Mumbai, Maharashtra, India

Supply Of 110v Ac 450mm Sweep Fixed Type Carraige Fan With Two Ball Bearings, Crash Worthy Stainless Steel Fan Guards As Per Icf Drg. No. Icf/sk3-7-6-026 Alt-b Col.1 And Frp B Lade As Per Rdso Drg.no.rdso/pe/sk/tl/0123-2009(rev-0) (without Regulator Switch And Re Sistance Box)as ...
Deadline: 26th May, 2026
ITB ID: 115838
₹Refer To Document
Details

South Eastern Railway

Rourkela, Odisha, India

Supply Of Set Of Control Node Assembly For Ebv Of Ccb Ii Brake System Of M/s Knorr Bremse Make Consists Of 02 Items In 02 Nos. Having-- (1) Control Node Assembly, Ebv, Ft 5000 L/software Part No.- 789991, Qty.= 1 No./set, (2) Control Node Assembly, Ebv, Ft 5000 L/software Part No...
Deadline: 26th May, 2026
ITB ID: 115837
₹Refer To Document
Details

South Eastern Railway

Sundergarh, Odisha, India

Supply Of Overhauling Kit For Air Dryer (sil Make) (17 Items). [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 115836
₹Refer To Document
Details

South Eastern Railway

Kharagpur, West Bengal, India

Supply Of Foot Step Assembly As Per Clws Drg. No.- 06/1/65/49 (alt.-3 Or Latest) For Wag-7 Loco Motive. One Set Consists Of Two Foot Step Assembly Out Of Which One Is Right Hand Foot Step Assembl Y & Another One Is Left Hand Foot Step Assembly. Details Of The Same Is Mentioned In...
Deadline: 26th May, 2026
ITB ID: 115835
₹Refer To Document
Details

South Eastern Railway

Sundergarh, Odisha, India

Supply Of Battery Charger Input Fuse As Per Abb Pt. No. 3bhe034676r0002. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 115834
₹Refer To Document
Details

South Eastern Railway

Kharagpur, West Bengal, India

Supply Of Grease For Traction Motor Roller Suspension Bearing. Approved Lubricants For Hhp(emd ) Locomotives, S. No. 6, Of Rdso's Maintenance Instruction No Mp.mi-15, Revision-13, May-2023, Exxon Mobil Make - Exxon Arapen Rb 320 Grease [ Warranty Period: 30 Months After The Date ...
Deadline: 26th May, 2026
ITB ID: 115833
₹Refer To Document
Details

Southern Railway

Chennai, Tamil Nadu, India

Supply Of Elastomeric Pad (design-b) As Per Rdso Drawing No. Wd-21109-s-02 And Confirming To R Dso Specification No. Wd-20-misc-95 Rev-05. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 26th May, 2026
ITB ID: 115832
₹Refer To Document
Details

South Central Railway

Vijayawada, Andhra Pradesh, India

Supply Of Extension 16 In+outputs As Per Plasser Part No. El-am30.00, Make- Plasser Imp ]
Deadline: 26th May, 2026
ITB ID: 115831
₹Refer To Document
Details

Southern Railway

Chennai, Tamil Nadu, India

Supply Of Pneumatic Rubber Hose To Withstand Air Pressure 10 Kg/sq.cm, Od-21mm, Id- 12.5mm And Length- 600 Mm With Both Ends Swivel Nut 1/2" And Flat Washer And Extra Ma Le And Female Adoptor 1/2" Flat Seating With Nylon Washer To Suit At The End Of The Ho Se Confirming To Sae 10...
Deadline: 27th May, 2026
ITB ID: 115830
₹Refer To Document
Details

Southern Railway

Avadi, Tamil Nadu, India

Supply Of Set Of Gasket For Jumper As Per Icf Drawing No.icf/sk-7-5-054, Alt. J/2 Of Shee T 1 & 2. (item No.4, Item No.21 And Item No.22) Set Consist Of Each Item One Number. Materi Al-neoprene Rubber-shore 'a' Hardness 70 +/-5. [ Warranty Period: 30 Months After The Date O F Del...
Deadline: 27th May, 2026
ITB ID: 115829
₹Refer To Document
Details

Northern Railway

Lucknow, Uttar Pradesh, India

Supply Of Must Change Items Poh Kit For Gabriel Shock Absorber - 600 Kg (consisting Of 19 Items) [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 27th May, 2026
ITB ID: 115828
₹Refer To Document
Details

North Western Railway

Ajmer, Rajasthan, India

Supply Of Disconnecting And Earthing Device, 8 Pole, 2way, Without Off, On Load 125a, At 1000v Ac, 2no+2nc And Heavy Handle And Pad Locking Arrangement In One Position, Mounte D In Stainless Steel Enclosure, Suitable For Ac 23 Duty, Confirming To Iec 60947, Maximum D Epth Includi...
Deadline: 27th May, 2026
ITB ID: 115827
₹Refer To Document
Details
Scroll to Top