Tenders
Southern Railway
Erode, Tamil Nadu, India
Modified Slack Adjuster Block For Wag-9/wag-7 Locos As Per Drg.no.sr.dee/rs/ed/mech-134. Note: Supply By Sour Ces As Per Clw Item Id: 2101027 And 2100215 In Ireps Vendor Directory. [ Warranty Period: 30 Months After The Date Of Deliver Y ]
South Western Railway
Bangalore, Karnataka, India
Supply, Installation, Commissioning Of Diesel Engine Driven Fork Lift Truck 5t Capacity As Per Specification Attached At Annexure. Makes/brands Accepted : Godrej, Include Om Voltas, Ace, Jos Ts, Yale Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Erode, Tamil Nadu, India
Set Of Stainless Steel Fasteners For E4b Section, Consisting Of 9 Items As Per Annexure Enclosed. Note: 1. Supply By S Ources As Per Clw Item Id: 2100233 In Ireps Vendor Directory. 2. Firm Should Submit Authorised Dealership Certificate Along Wit H Tender Otherwise Offer Will Not...
Southern Railway
Erode, Tamil Nadu, India
Thermoplastic Polyurethane Spring Pads (happy Pads) For Secondary Springs Of 3phase Locos As Per Ref.no: 2 (6mm T Hickness) Of.s.c.rly Drg.no: C/els/lgd/bogie/3/140, Alt.2 & Rdso Spec.no: Mp.0.40.99.01 Rev. Note: Supply By Sources As Per B Lw Item Id: 2201253 In Ireps Vendor Dire...
Northern Railway
Amritsar, Punjab, India
Supply Of Cast Steel Casnub 22hs Bogie For Bvcm Wagon. Detailed Description, Drawing And Specificat Ion Is As Per Attached Annexure-a. [ Warranty Period: 72 Months After The Date Of Delivery ]
Northern Railway
Amritsar, Punjab, India
Supply Of Modified Guard Chair(new Design) For Bvcm Wagon. Drg. No. Wd-15009-s-13 Item-25, Alt.-3 Or Latest & Wd-24025-s-01 Shee T-1 & Sheet-2, Alt-nil Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Brake Pad For Lhb Coaches [one Right Hand And One Left Brake Pad Non- Asbestos Based Organic 400 Sq. Cm.and 35 Mm. Hardness,in Two Halves(one Rh And One Lh) Of 200sq.cm.each For Lhb Coaches,as Per Rdso Spec .no. Rdso/2013/cg-01,amendment 01. [ Warranty Period: 30 Months...
Central Railway
Bhusawal, Maharashtra, India
Supply Of Set Of Connecting Strip Assly. With Modified Brake Hanger Lever Of Wap-1/4 Loco Bogies.(1) Connecting Strip Assembly As Per Clw Drg.no. 03/3/19/53 Alt-5-ref.1 & 3 Qty=08 Nos. (2) Connecting Str Ip Assembly As Per Clw Drg. No. 03/3/19/91 Alt-5-ref.1 To 4 Qty=04 Nos.(3) C...
Central Railway
Mumbai, Maharashtra, India
Supply Of Overhauling Kit For Woodward Governor To W.w. Pt. No. 8928 - 903, Kit Consisting Of 4 9 Items. Annexure Sheet Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Bhusawal, Maharashtra, India
Supply Of Set Of Brake Gear Pins And Trunion For Wag-7 Loco Bogie, Comprising Of 13 Item S 144 Nos. As Per Sketch No. Bsl/elw/sk.no.9168, Alt-5. [ Warranty Period: 30 Months After The D Ate Of Delivery ]
Central Railway
Bhusawal, Maharashtra, India
Supply Of Drum Contact Segment Assly. T-type For 1500 Amps Reverser. As Per Clw Drg.n O.3twd.101.050 Alt-3 (sheet No.1) & 2twd.101.050 Alt-7 (sheet No.2.). [ Warranty Period: 30 Mo Nths After The Date Of Delivery ]
North Eastern Railway
Gorakhpur, Haryana, India
Supply And Installation Of Modified Pneumatic Piping Arrangement To Relocate Acp Isolation Cock/valve In Order To Make It Accesible With In A Hand - Stretch Distance As P Er Icf Cai No B-2022/01 , Dated 23/5/22 (scope Of Work & Bill Of Material Attached) [ Warranty Period: 30 Mon...
North Eastern Railway
Gorakhpur, Haryana, India
Supply , Installation For Set Of Item For Provision Of Additional Dirt Collector In Bp Line Before Fiba Device In All Lhb Coaches As Per Drg. No. M1007796 Alt- Nil , Item No. 2,3, 4,5 & 6 (annexure Attached) [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Maintenance Kit For Duplex Check Valve [m/s Ftil Make ]
Central Railway
NASIKCITY, Maharashtra, India
Supply Of Commutator Assembly With Steel Parts Of 4303 By Tm Armature As Per Drg. No.2tmw/drg/4 303 By/001 Alt-1 Sheet No. 1, 2 And 3 Attached (qty 10 Nos) [ Warranty Period: 30 Months After The Dat E Of Delivery ]

