Tenders
East Central Railway
Mughalsarai, Uttar Pradesh, India
Supply Of Connecting Rod For Brake Gear To Rdso Drg. No. Wd-80007- S 19, Item. 2, Alt. No.18. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Mughalsarai, Uttar Pradesh, India
Supply Of Yoke Pin For Upgraded High Tensile Centre Buffer Coupler Of Boxn Hl. Drg: Latest Sk-627 24 Item No. 12, Alt-31, Rdso Spec: Wd-70-bd-10 Rev.-4. [ Warranty Period: 72 Months After The Dat E Of Delivery ]
East Central Railway
Latehar, Jharkhand, India
Supply Of Brake Head Pin. Wd-08093-s/2, Item-8, Alt-3, Similar To Kbi Part No.778112. Spec. No. Wd 23-bmbs-2008 Rev.1spec: Wd-23-bmbs-2008 [ Warranty Period: 36 Months After The Date Of De Livery ]
East Central Railway
Samastipur, Bihar, India
Supply Of Louver Part Complete For Lavatory Window Of Lhb Coaches, As Per Rcf Drg. No. Mi0071 69, Alt-nil. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Mughalsarai, Uttar Pradesh, India
Supply Of Pin Flat Head Size 41 Dia, 163.5 Long To Rdso Drg. No. L/pn-631/m, Item No. 1 To 5, Alt. 6 . [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Tirupati, Andhra Pradesh, India
Supply Of Frp Louvre Shutter Assy. For 3 '-0" Windows Conforming To Rdso Specificati On No.rdso/2007/cg-02 (rev-1), Amnement No. 2 To Icf Drg No : Icf/ Sk- 5-4-197, Col. I Alt : B / Nil. [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Worm Drive Hose Clamp Made Of Stainless Steel, Grade Ss 304, Size 90 Mm Confirming To Is: 476 2 / 2002. Make. Klipco, Norma Only Accepted. [ Warranty Period: 12 Months After The Date Of Delivery ]
North Central Railway
Jhansi, Uttar Pradesh, India
Supply Of Piston Rod Part No. 2e.36.452 Drawing No. Rdso/tm/17/20, Specification No. Tm/hm/6/480 [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Mumbai, Maharashtra, India
Supply Of Gravity Cock 1/2 Inch As Per Icf Drg. No.icf/sk-6-3-369, Alt- H/2(powder Coated To Glossy Finish Smoke Gray Colour [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
CHITTARANJAN LOCOMOTIVE WORKS
Chittaranjan, West Bengal, India
Supply Of Centre Sill Complete For Wag-9hc, Drg-no.1209-02.126-012 Alt.3 As Per Specn. C Lw/ms/3/154 Alt.2 [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Fibrin Glue 2ml (as Per Detailed Specifications Attached) [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of 2 X 500 Kva Igbt Based Hotel Load Converter For 3-phase Electric Locomotive Wap-7 Locos S Pecn : Clw/es/3/igbt/0490 Alt-d (rev.1) [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Sub Kit Aoh-i For Aoh Maintenance Of N-32 Tap Changer Comprising Of 29 Nos Common Items As Per Annexure - Q-1 And 24 Nos. Common Hardware Items As Per Annexure - Aoh-hw-1 (tota L 53 Items) Of M/s. Aes Or M/s. Repl [bt Type ]
INTEGRAL COACH FACTORY
Chennai, Tamil Nadu, India
Supply, Installation And Commissioning Of Automatic Fire Detection Cum Suppression Sy Stem (high Pressure Water Mist System) For Lwlrrm And Lwcbac Coaches As Per Specification Is/rds O/cg/s/22001, Amd-01. [ Warranty Period: 48 Months After The Date Of Delivery ]
Rail Coach Factory
Kapurthala, Punjab, India
Supply, Installation & Commissioning Of Aluminium Modular Toilet With Ss Fl Ooring For Lhb Slr Amrit Bharat Coaches. Note: Safety Clause Must Be Followed Accord Ing To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated. 01.04.2025. As Per Drawing: As Per Ann Exure To Specification No....

