Tenders
South Central Railway
Nanded, Maharashtra, India
Supply Of [ph No. 14010 ]
South Central Railway
Nanded, Maharashtra, India
Supply Of (ph No.:58032) Tab.favipiravir 200 Mg. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
South Central Railway
Nanded, Maharashtra, India
Supply Of (ph No.:03085) Paracetamol 100 Ml Iv Inj. [ Warranty Period: 30 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Lumding, Assam, India
Supply Of Safety Shoes With Steel Toes As Per Is 15298 (part-2): 2011 Or Latest/iso: 20345:2004, Low A Nkle Safety Shoes With Leather Upper And Steel Toe, Pu Sole As Per Is 15298 Part-ii 2016, Make: Bata/liber Ty/action. (for Sse/p-way/jid: Sizes: '4' = 1 Pair, Sizes: '5' = 5 Pai...
South Central Railway
Tirupati, Andhra Pradesh, India
Supply And Installation Of Safety Life Line At Incoming Shop In Carriage Repair Shop, Tirupati, As Per Drg N O-scr/crs.j&t.no-273 And Scope Of Work Attached As Annexure-a. Quantity As Mentioned Below: 1). 50 Mm Gi Pipe Wit H Threaded End Sand Couplings - B Class -120 Mtrs (make-t...
South Central Railway
Nanded, Maharashtra, India
Supply Of (ph No.:20019) Ritonavir 100 Mg Tab [ Warranty Period: 30 Months After The Date O F Delivery ]
Indian Railway
Varanasi, Uttar Pradesh, India
Corrigendum : Supply Of Flat Washers Kit For Las As Per Drg.no. 29359387 Alt-a [ Warranty Period: 72 Mont Hs After The Date Of Delivery ]
East Coast Railway
Visakhapatnam, Andhra Pradesh, India
Supply Of Valve Assembly Unloader Piston Type (air Compress,gd Part No.wxe55312 To Emd Pt.no.8091459. [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Varanasi, Uttar Pradesh, India
Corrigendum : Supply Of Spring Washers Kit For Las As Per Drg.no. 29359351 Alt B [ Warranty Period: 72 Mon Ths After The Date Of Delivery ]
South East Central Railway
Bhilai, Chhattisgarh, India
Supply Of Liplex-t2 Grease Of M/s Balmer Lawrie Or Servogem 2. Grease Of M/s Indian Oil Corpor Ation Limited For Pantograph Servomotor. Make Balmerol Or Iocl Only. [ Warranty Period: 30 M Onths After The Date Of Delivery ]
rail wheel plant
Bengaluru, Karnataka, India
Supply Of Spohn & Burkhardt 2axis Master Controller 4-0-4 Notch, Stayput Operation Type Each Axis, With 9poles (contacts)each Axis Operated By Individual Cams To Give The Switching Programme As Per Drg. Wap/el/sk-712, On Both Axis And As Per Per Kom Nr2021309. The 9 Poles Will Be...
Western Railway
Mumbai, Maharashtra, India
Supply Of Conductor Copper Hard Drawn ,5 Mm Dia ,round Copper Wire As Per Is:282-1982 For Dropper Wire.(core). [ Warranty Period : 30 Months After The Date Of Delivery ]
Western Railway
Ratlam, Madhya Pradesh, India
Single Integral Unit Respiratory Filter- Full Face Masks , 1. Material -epdm 2.test Report Of Go Vt/nabl Lab Submitted At The Time Of Supply. ]
Western Railway
Valsad, Gujarat, India
Supply Of Deflector Plate Compatible With 60 Kg Rail With All Hardware Accessories For Fixing The Transmi Tter Coil And Receiver Coil Suitable For Digital Axle Counter As Per Rdso Spec. Rdso/spn/177/2012 Ver 3.0 O R Latest (one Set Consists Of One Left And One Right Side). [ Warr...
Western Railway
Ahmedabad, Gujarat, India
Supply Of Toh Kit For High Reach Pantograph Type-lx3600, Make-ftrtipl. (each Kit Consists Of 26 Ite Ms In 57 Nos. As Per Annex. [ Warranty Period: 30 Months After The Date Of Delivery ]

