Tenders
North Eastern Railway
Gorakhpur, Haryana, India
Supply Of Inj. B Complex ,inj. Containing Atleast Thiamin , Pyridoxine, Niacinamide Single Dose In Amp/v Ial Single Dose [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Hex Head Bolt M12x65-n High Tensile As Per Drawing/spec. Is:1364(part-1)-1992- Ce 10.9 Coating As Per Mdts-057, Make :-tvs/lps/unbrako [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Gorakhpur, Haryana, India
Supply Of Clotrimazole 100mg Vaginal Pessaries [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Bhusawal, Maharashtra, India
Supply Of Pressure Switch (100psi) Ftrtipl Part. No. -029106500a For Ftil Make Air Dryers. [ Warrant Y Period: 30 Months After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Supply Of Jzv Card Of Drawing No. 3eb 8242/1 Of Make : M/s Escorts Kubota Ltd. [ Warrant Y Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Gorakhpur, Haryana, India
Supply Of Cooler Kit Atlas Copco Part No-290605660 For Atlas Copco Make Electric Driven Rotary Screw Type Compressor Model Ga-160(air Cooled). [ Warranty Period: 30 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Bongaigaon, Assam, India
Supply And Fitment Of Spare Parts For Maintenance Of Railway Tractor Model No. 430 As Per E Nclosed Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Lumding, Assam, India
Supply Of Curtain With All Accessories Readymade With Installation. [ Warranty Period: 30 Months Aft Er The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Dibrugarh, Assam, India
Supply Of "draw Hook / Bg - Icf" Drawing No: Sk-99004, Alt- 2 Or Latest. Material Spec: Is: 5517/1 993, 35 Mn6 Mo3, Or Latest & C-9509 (rev-02) With Amendment-1 Of Oct-2016 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Dmc Terminal (07 Nos./set) For 4.5 Kw, 110 V Dc, 37.5 Amps Kel Make Rectifier Cum Regulator Unit (rru) To Kel Part No. C32 13. [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Raipur, Chhattisgarh, India
Supply Of Disc Valve Assly Dia 60 For Main Compressor, To Elgi Part No.a-070017 (new). Specn: Elgi Part No.a-070017 [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Raipur, Chhattisgarh, India
Supply Of Programme Switch Hvsi For Rectifier Panel To Siemen's New Order No.250-4yw-015w Hv Si. As Per Clw Specification No.clw/es/s-1 [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Current Transformer Suitable For 25 Kw Presstech Make Rrus As Per Presstech Part No. Sig25011 & Rdso Specification No: Rd So/pe/spec/ac/0056-2014(rev-1). Make: Presstech. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Bearing Lock Washer For Used In Non Terminal Board Side And Terminal Board Side Suitable For 25kw Alternator, Dishita Make Part No: D2513034 As Per Rdso Specification No: Rdso/pe/spec/ac/0056-2014(rev-1). Make: Dishita Enterprises Pvt Ltd. [ Warranty P Eriod: 30 Months ...
Indian Railway
Patiala, Punjab, India
Supply Of Doxofylline 400 Mg Tab/cap ]

