Tenders
Eastern Railway
Multi city, Multi State, India
Supply Of Isi Marked & Ce Certified Pressure Regulator 2 Stage Type Acetylene Used In Welding & Cuttin G Process Conforming To Is : 6901:2009 Or Latest. Specification As Per Annexure Attached. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]
Eastern Railway
Multi city, Multi State, India
Supply Of Door Spring (item No- 19) Of Rcf Drg. No. Lw56424 Alt. F, Material & Spec. As Per Drg. [ War Ranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Multi city, Multi State, India
Corrigendum : Supply Of Quick Coupling Arrangement Of Bvzc (plug And Socket Assy.) For Detachable Pre Ssure Gauge To Rdso's Drg.no:wd-91101-s-05, Alt.5, It.1 To 14 In Assembled Condition And Con Forms To Rdso's Specn.no:02 Abr-2002,amendment-1/2007 (appendix-'n')1 [ Warranty Peri...
Eastern Railway
Multi city, Multi State, India
Supply Of Equal Tee 20 Bore, As Per Drawing: Is: 1239 ( Part-2)-1992 Table-8, Threads Iso7-1, Aisi3 04, Packing Instruction: Items Should Be Individually Wrapped With Corrugated Paper And Collectively Packe D In Wooden Box Having Sufficient Strength, Further Tied With Suitable Ny...
Eastern Railway
Multi city, Multi State, India
Supply Of Rubber Packing Alp 04004 As Per Rcf Drg. No. Lj54110 Alt.a, Item No. 10. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Multi city, Multi State, India
Supply Of Window Bar To Diameter 12 Mm X Length 1428 Mm Of Body Side Window Arrangement For Lh B Type Jan Shatabdi Coach. Material And Specification As Per Drg. No. Lj54110 Alt. "a", Item No. 4 (to Be Pow Der Coated, Colour - Black). [ Warranty Period: 30 Months After The Date Of...
Eastern Railway
Multi city, Multi State, India
Supply Of Hex Nipple 25 Mm Bore As Per Drg. No. Is: 1239 (part-2)-2011, Table-28, Threads Iso7-1, Aisi304, Packing Instruction: Pi042 [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Multi city, Multi State, India
Supply Of Tata Diesel Exhaust Fluid -def Make/ Brand - Tata Or Similar [ Warranty Period: 12 Months After The Date Of Delivery ]
Western Railway
Multi city, Multi State, India
Supply Of Hdpe Moduled Flat Bottom Crates : Size 400x300x100mm [ Warranty Period: 30 Months After The Date Of Delivery ]
North Western Railway
Multi city, Multi State, India
Supply Of Titanium Elastic Nail (tens) Of All Sizes With Instrumentation Box (returnable) [ Warranty Pe Riod: 30 Months After The Date Of Delivery ]
Central Railway
Multi city, Multi State, India
Supply Of Set Of Crates (i) Industry Standard Crated Qty 25 Nos. (ii) Crates 45 Fpo Bin Qty 48 Nos. (iii) Crates 50 Fpo Bin Qty 36 Nos., As Per Attached Specification. [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Central Railway
Multi city, Multi State, India
Supply Of Set Of Hinge Bracket For Middle Berth As Per Drawing No. Mg/scn-6-1-004, Alt-f . One Set Co Nsisting Of 01 No. Lh & 01 No. Rh. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Multi city, Multi State, India
Supply Of Tie Coat As Per Rdso Spec.m&c/pcn/114/13 [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Central Railway
Multi city, Multi State, India
Supply Of (for Vande Bharat Train Set) Set Of Mirrors For Trainset Coaches. One Set Consists Of 1) 74 0x745x5mm Mirror-01 No 2) 800x680x5mm Mirror -07 Nos Mirror Should Be Cnc Edge Polished 1 Mm X 45 Degree On Edges. Each Set Should Be Packed Properly In Wooden Box To Prevent Bre...
Central Railway
Multi city, Multi State, India
Supply Of Bracket As Per Drawing No:-3 10113.0.03.130.144 For Head Stock For Lhb Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ]

