Tenders
Central Railway
Nagpur, Maharashtra, India
Design, Manufacture, Supply, Installation, Prove-out And Commissioning Of Computerized An D Automated Bmbc Test Bench As Per Specification Enclosed In Annexure-a And Annexure-b [ Warranty P Eriod: 30 Months After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Set Of Female Insulated Spade Wire Connector Electrical Crimp Terminal. Each Set Consists O F (1) 1.5 Square Mm Red Colour-01 No. (2) 2.5 Square Mm Blue Colour-01 No (3) 4 Square Mm Yellow Colo Ur-01 No. All Snap Types Terminals Lugs. Note- 01 Sample Set To Be Got Approved Before...
East Central Railway
Dhanbad, Jharkhand, India
Supply Of Ioh Kit For Parker Make Pressure Regulator Confirming To Seil Part No. Mfr13791_01 For Singl E Bottle Schneider Make Vcb. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Supply Of Refrigerant Gas R407c As Per Is:5610/1993(second Revision) In 10 Kgs Capacity Cylinder To Is :3196 Part 1 .(note: Cylinders Are In Non ?returnable Basis Only).note: To Be Procured From Past Proven Of S Ame Item In Indian Railway. [ Warranty Period: 30 Months After The D...
Central Railway
Pune, Maharashtra, India
Single Row Deep Groove Ball Bearing 6309 2z/c3 Of Skf/fag/ntn/koyo Only. Supply Should Accompany With Valid Authorized Dealership Certificate. [ Warranty Period: 30 Months After The Date Of D Elivery ]
NORTH EAST FRONTIER RAILWAY
Dibrugarh, Assam, India
Supply And Fitment Of Air End Assembly 127 Bd N For Kpcl Air Screw Compressor Mo Del No Kes 55, Part No. 273.10.39. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Pune, Maharashtra, India
Supply Of Spare Part Of Sub-d Connector As Per Clw Spec No. Clw/es/3/0124 And As Per Annexure Attached. [ W Arranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Darbhanga, Bihar, India
Supply Of Carbon Sliding Strip Sk (85 Cu As Per Schunk Metal & Carbon (i) Pvt Ltd. Part No- Sk 15 90 For Schunk Make High Reach Pantograph Wbl-85 Hr,part No.- Sk 1590 (909030009400) Spec: Part No.- Sk 1590 (909030009400) [ Warranty Period: 30 Months After The Date Of Delivery ]
West Central Railway
Bhopal, Madhya Pradesh, India
Supply Installation, Testing And Commissioning Of N.b.iot & B.l.e Enabled Three Phase Smart Prep Aid/postpaid Energy Meter. Technical Specification Are Attached In Pdf. [ Warranty Period: 120 Months After Th E Date Of Delivery ]
West Central Railway
Rewa, Madhya Pradesh, India
Supply Of Description- Digital Buffer Height Gauge, Model Bhg-3 (cbc) The Gauge Consists Of A Foldable Track Base & A Vertical Column Fitted With A Pointer. This Column Has A Vertic Ality Bubble And Is Foldable For Compactness. The Height Readings Are Displayed On Digital Display...
Eastern Railway
LILUAH, West Bengal, India
Supply Of Axle Box Rear Cover_machined As Per Drawing No. C-a675uv2-135767, Rev. 3 For Roller Bearing Arrangement Of Vande Bharat Train Set (details As Per Uploaded Annexure-a At Item Sl No. 0 9). [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Howrah, West Bengal, India
Supply Of Gasket [for Lube Oil Filter ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Set Of Hoses As Per Ftrtipl Part No.790008206 Or Its Equivalent Of M/s Kbi Part Nos. One Set Consist Of 02 Items. Set Details As Follows. 1) 1 Inch Uic Hose Mrep As Per Frtripl Part No.008002000 Or K Bi Part No. Ii76087.- 02 Nos./set. 2) 1 Inch Uic Hose 905mm Long W/o A...
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Set Of Fixed And Mobile Contact For 8.41 Contactor For Discharging Resistor T O Clw Spec:clw/es/3/0088 [ Warranty Period: 30 Months After The Date Of Delivery ]
Southern Railway
Chennai, Tamil Nadu, India
Supply Of Red Aspect Main Led Signal, 110 V Ac Retrofitable In Existing Cls Housing And Compatible With Ac Led Ecr As Per Rdso Specification No. Rdso/spn/199/2010(rev-1.0 )or Latest. [ Warranty Period: 30 Mo Nths After The Date Of Delivery ]

