Tenders
Central Railway
Multi city, Multi State, India
Supply Of Teflon Tape For Sealing Threaded Pipe Joints Screwed Fittings To Size 25mm Widt H X 0.1mm Thick X12mtrs Long In Roll. Make/brnd- Champion/mazda/kohinoor Only. [ Warranty Period: 30 Months After The Date Of Delivery ]
Central Railway
Mumbai, Maharashtra, India
Supply Of Padding Cotton (wadding) To Specification No. Trim/mtn/specification/001 Issued Dat E 21.03.2005, Size: 1/2" Thick, Length 12 Yard Per Bundle. Packing: Packing Cotton Padding Should Be Neatly Packed In Suitable Plastic Bags. [ Warranty Period: 30 Months After The Date O...
Central Railway
Nagpur, Maharashtra, India
Supply Of Dynamically Balanced Rotor With Shaft Suitable For Ocb Motor Of Make Ic Elect Ric For 3 Phase Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Asansol, West Bengal, India
Supply, Installation, Testing And Commissioning Of Hot Axle Box Detector (habd) On Turnkey Basis (details As Per Attached Annexure) [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Kanchrapara, West Bengal, India
Supply Of Clamp. Design & Dimensions As Specified In Attached Drg. No. Er/kpa/misc-120. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Jamalpur, Bihar, India
Supply Of Tm Temperature Sensor (suitable For Medha,siemens & Emd Ac-ac Traction System), Pl.no. 18080157 [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Rourkela, Odisha, India
Supply Of Radial Fan For Fdu For Wag-9 Loco To Type No. Rl 90-18/12n 12 Volt Dc 460ma, 6.3 Watt S. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Bottom Base Plate Ss304 For 3-phase Transformer Expansion Tank Pipe As Per Drg. No: C/els/lgd/ Tfp/3/45 Alt-2. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Relay Valve Of Ccb Brake System As Per Kbil Part No. Ii46448/001. [ Warranty Period: 30 Months After The Date Of De Livery ]
Southern Railway
Ranipet, Tamil Nadu, India
Supply Of Industrial Cutting Gas To Bharat Cutting Gas Of M/s.bharat Petroleum Corporation / Nano Cut Of M/s. Ioc Ltd. / Hp Razor Pro Of Hindustan Petroleum Corporation Ltd. [ Warranty Period: 30 M Onths After The Date Of Delivery ]
South Central Railway
Secunderabad, Telangana, India
Supply Of Ss Hex. Head Bolt Of Size M10 X 50mm Length With Two Flat Washers And One Spring Washer With Suitable Nut. Grade: Ss304. [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
BARELI, Madhya Pradesh, India
Supply Of Stainless Steel Luggage Rack For Lhb Coaches As Per Drg.no. La62102 Alt G, Pa Cking Instruction - Pi139. [ Warranty Period: 30 Months After The Date Of Delivery ]
NORTH EAST FRONTIER RAILWAY
Jalpaiguri, West Bengal, India
Supply Of P U Pad For Arm Rest Of Lhb Chair Car, Colour Green. Drawing. No.:- Judw/mech/11-618 Alt-nil, Or Latest, Item-2, Colour- Green Mat. Spec.:-as Per Drawing With Latest Revision And Amendment . [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
BARELI, Madhya Pradesh, India
Supply Of Pipe Clamp For 25 Mm Bore As Per Drg.no.cc35326 Alt C, Packing Instructon - Pi001 Ver1.0, Protecton Procedure - Wi100100, Quaility Pilan - N.a [ Warranty Period: 30 Months After The Date Of Delivery ]
South Western Railway
Hubli, Karnataka, India
Supply Of Vaccume Based Blood Collection Plastic Tubes With Sodium Flouride 4ml Cap Acity ]

