Tenders

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Compact Flash Memory Card For Aal Speedometer Part No. Accsr 000008. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 22nd Jul, 2026
ITB ID: 251845
₹Refer To Document
Details

North Eastern Railway

Bareilly, Uttar Pradesh, India

Supply Of Lever Assembly Complete To M/s. Bt Pt. No. A4540 To Drg. No. Hagt- 225320 R1, Spare For Air Motor Of Tap Changer Type No. 32 [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 22nd Jul, 2026
ITB ID: 251844
₹Refer To Document
Details

South Eastern Railway

West Singhbhum, Jharkhand, India

Supply Of 9.5 Meter Long Standard Traction Mast (fabricated With Batten Plates) B-series As Per Rdsos Drawing No. Etuc/o071 Mod-e. Mast Should Be Galvanized As Per Rdso Specification No. Eti/ohe /13(4/84 ) With A&c Slip No. 1,2 &3 Or Latest And Mass Of Zinc Coating To Be 610gm/sg...
Deadline: 22nd Jul, 2026
ITB ID: 251843
₹Refer To Document
Details

North Central Railway

Jhansi, Uttar Pradesh, India

Supply Of Axle Box Housing (finish Machined) To Icf Drg. No. T-0-2-602 Alt. V/14, Sheet No. 1 & 2, Item No. 2, Conforming To Rdso Spec. No. Rdso/2007/cg-08 With Amendment Slip No. 1 Of July 2009. [ Warranty Period: 36 Months After The Date Of Delivery ]
Deadline: 22nd Jul, 2026
ITB ID: 251842
₹Refer To Document
Details

Modern Coach Factory Raebareli

BARELI, Madhya Pradesh, India

Supply Of Wash Basin Complete For Disabled Lavatory For Lhb Slr Hog Coaches (31 Sea Ter) As Per Drg.no. Lr63303 Alt Nil,packing Instruction:pi042 Ver-1.0 [ Warranty Period: 30 Month S After The Date Of Delivery ]
Deadline: 23rd Jul, 2026
ITB ID: 251841
₹Refer To Document
Details

CHITTARANJAN LOCOMOTIVE WORKS

Chittaranjan, West Bengal, India

Supply Of Set Of Roof Bar Along With Hardwares For Wag-9hc Loco To Spec./drg. No. C Lw/es/3/0063/g [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 25th Jul, 2026
ITB ID: 251840
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Srdg Ball Bearing Skf-6312 With C3 Clearence. Rdso Approved. Skf(europe/india), Fa G(germany/india), Nbc(nei). [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 28th Jul, 2026
ITB ID: 251839
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Uttar Pradesh, India

Supply Of Ammonia Paper Roll Size 1.02m(w)x10m(l)in Rolls Make- Asian Or Star Or Similar ]
Deadline: 29th Jul, 2026
ITB ID: 251838
₹Refer To Document
Details

North Western Railway

Bikaner, Rajasthan, India

Supply Of Pre Shortner For Rf-361 Draft Gear Minor Design. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
Deadline: 29th Jul, 2026
ITB ID: 251837
₹Refer To Document
Details

North Central Railway

Jhansi, Uttar Pradesh, India

Supply Of Coupler Body For Transition Cbc To Rdso [w ]
Deadline: 29th Jul, 2026
ITB ID: 251836
₹Refer To Document
Details

CHITTARANJAN LOCOMOTIVE WORKS

Chittaranjan, West Bengal, India

Supply Of Ball Valve G3/4" To Clw Specn./drg. No. Clw/es/3/0117/c. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 30th Jul, 2026
ITB ID: 251835
₹Refer To Document
Details

South Western Railway

Hubli, Karnataka, India

Supply Of Rubber Pad For Primary Suspention For Fiat Ir Bogie To Drg No 1901097 Ver.08r1 R Ead With T.s. 17.531 100 03, T.s.17 617 100 02, Mdts-148 Rev."01"& Mdts-122 Rev.03. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]
Deadline: 31st Jul, 2026
ITB ID: 251834
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Interlock Washer Suitable For M16 Bolts To Rcf Drg. No. 1268732 Alt. 07r4. Item -19. Ma Tl. & Specn. As Per Drg. Make/ Brand - Disc Lock / Nord Lock /dur Lock / Gallock As Given In Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 31st Jul, 2026
ITB ID: 251833
₹Refer To Document
Details

North Eastern Railway

Gorakhpur, Haryana, India

Supply Of Silicon Rubber Compound (ke45 Rtv-r Of Shin-etsu Or Anabond 685 Of Anabond) Colour Clear Confirming To Spec No. Ao 113, Alt-a (shelf Life 12 Month) Specn: Spec No. Ao 113, Alt-a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Deadline: 4th Aug, 2026
ITB ID: 251832
₹Refer To Document
Details

NORTH EAST FRONTIER RAILWAY

Dibrugarh, Assam, India

Supply Of Uic Type Rubber Vestibule. Drawing - Rdso Drawing No.- Sk-99056,item 2 To 14 & 25, Al T-3 Or Latest & Sk-99057, Item-8, Alt-2 Or Latest. Mat. Spec. - Rdso Spec. - Rdso/2007/cg-05 With Rev- 01 Or Latest. [ Warranty Period: 60 Months After The Date Of Delivery ]
Deadline: 4th Aug, 2026
ITB ID: 251831
₹Refer To Document
Details
Scroll to Top