Ot-96/24-25 Of Se/gcc-ii - Dismantling Of Rcc And Clearing And Disposed Away From The Site To A Distance Of 5 Km Including Lead Lift And Transporting Charges Major & Minor T&p Etc., Complete And As Directed By The Engineer At Site., Earth Work Excavation Hard Red Earth, Shales, Murram Gravel, Stoney Earth And Earth Mixed With Small Size Boulders, Hard Gravelly Soil And Depositing On Bank With Initial Lead Of 10m And Lift Of 2m Etc.complete, M Sand Filling Including Cost Of Sand, Filling Charges, Labour For Watering And Consolidation Leads And Lift Etc., Complete., Plain Cement Concrete 1:3:6using 20mm Hbg Stone Including Cost Of All Materials Lead And Lift Etc Complete., R:c:c 1:1:5:3 Using 12 To 20mm Metal Without Form Work For Raft Including Cost Of All Materials, Curing, Labour, Lead, Etc., Complete., Rcc 1:1.5:3, With 20mm Hbg M/c Metal With Form Work For Plinth Including Cost Of Cemetn And All Lead, Lift, Curing Etc. Complete (but Excluding The Cost Of Steel Reinforcement), Providing Steel Reinforcement Including Cost Of Steel Labour For Cutting, Bending Tying With Binding Wire And Placing Reinforcement As Directed By The Engineer At Site Etc Complete., Fabrication & Assembling Of Template In Position Including The Cost Of Materials Labour, Lead, Lift, All T&ps Etc Complete And As Directed By The Engineer At Site Etc Complete., Fabricating Supply And Fixing In Position Of 24mm Dia Bolt & 2 Nos. Nut And Washer Top 15cm Thread, Bottom 15cm For Equipment Plinth Including The Cost Of Materials Labour, Lead, Lift, All T&ps Etc Complete And As Directed By The Engineer At Site Etc Complete. (24 Mm Dia Bolt ), Dismantling Of Existing Gantry Structure Heavy Structure, Ms Channel, Ms Angle Including Cost Of Labour, All T&ps, Lead, Lift Etc., Complete And As Directed By The Engineer At Site., Supply, Fabrication, Sand Blasting & Zinc Painting Of 16 Mm Base Plate Including Cost Of All Material, Labour, Lead, Lift Etc., Complete As Directed By The Department Engineer At Site., Labour Chargers For Erection Of Structure Including The Cost Of All Labour ,lead,lift Etc., Complete Asdirected By The Dept.engineer At Site., Painting For Rust Removing, Cleaning Painting Of First Primer Coat (red Oxide Paint) Of All Sections Including Cost Of Paint, Brush And Consumables), Plastering In Cm 1:3 12 Mm Thick Including Cost Of All Materials, Labour,lead, Lift Etc. Complete., Colour Washing Two Coat Approved Cement Paint Over White Washing Including Cost Of All Materials, Scaffolding, Labour With All Leads And Lifts Etc., Complete, Gst For Bidders Within Tamilnadu, Sgst, Cgst, Gst For Bidders Outside Tamilnadu (igst)

Procurement Summary

Location

Organisation Name

Amount

AOC Date

Chennai, Tamil Nadu, India

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

337944.00

23rd May, 2025

Work Description

L1 Details

Awarded Value

Selected Bidder

337944.00

SAI NILAM ENTERPRISES

Want to bid in this tender?

Get local agent support on this tender.

Contact Us
← Back to List
Scroll to Top