Supply Of Stainless Steel Tubes And Double Ferrule Fitting For Lhb First Ac Coaches, A S Per Drawing: Material Schedule As Per Set List No Rcf/md/mat Schedule/lwfac Version 00 With Design Correction Slip Cs-01 Dated 10/04/2025, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To B E Protected With Suitable Covering To Prevent It From Damage. However Transit Damag E If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delive Ry ]

Procurement Summary

Location

Organisation Name

Amount

AOC Date

Kanakapura, Karnataka, India

Rail Coach Factory

2498342.24

18th Jun, 2025

Work Description

L1 Details

Awarded Value

Selected Bidder

2498342.24

M/s. H P VALVES AND FITTINGS INDIA PRIVATE LIMITED

Want to bid in this tender?

Get local agent support on this tender.

Contact Us
← Back to List
Scroll to Top