Mudhalvarin Grama Salaigal Membattu Thittam Mgsmt 2025-26 Phase- I Package No. Tn05-02 3 Nos In Oddanchatram Block Of Dindigul District - Name Of The Work : 1. Upgradation Of The Road From Veeralapatty - Velur Bt Road Km 0/0 - 1/060 (r 102)estimate Amount : Rs. 35.23 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -1/060, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -1/060, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -1/060, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -1/060, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -1/060, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -1/060, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -1/060, Provision For Km Stone, Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Km Stone, Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 2. Upgradation Of The Road From Komalipatty To Thalaiyuthu - Edaiyakottai Road (via,burial Ground) Km 0/0 - 0/800 (r 550)estimate Amount : Rs. 35.59 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -0/800, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -0/800, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -0/800, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -0/800, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -0/800, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -0/800, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -0/800, Provision For Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Construction Of Retaining Wall At Ch 0/6, Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation., Cement Concrete 1 : 4 : 8 Mix Using 40mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed., Cement Concrete 1 : 3 : 6 Mix Using 40mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed., Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29m High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25x25x3mm For Boarding Laid Over Silver Oak (country Wood) Joists Of Size 10x6.50cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13cm Dia Spaced At 75cm C/c Etc. Complete., Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}, Name Of The Work : 3. Upgradation Of The Road From Periyakottai Kaliammankovil To Thumbalapattiyar Thottam Road Km 0/0 - 1/000 (r 389)estimate Amount : Rs. 26.54 Lakhs, A. Construction Work Clearing And Grubbing Road Land Including Uprooting Wild Vegetation, Grass, Bushes ,scrubs,saplings And Trees Of Girths Upto 300mm, Removal Of Stumps Of Such Trees Cut Earlie And Disposal Of Unserviceable Material And Stacking Of Serviceable Materials To Be Used Or Auctioned, Upto A Lead Of 1000m Including Removal And Disposal Of Top Organic Soil Not Exceeding 150mm Thickness As Per Technical Specification Clause 201. Etc. Comp., Km 0/0 -1/000, Earth Work Excavation From Borrow Pits For Filling In All Classes Of Soil Except Sand And Hard Rock Etc With Initial Lead And Lift For Raising And Widening The Existing Road Sidedrain Etc, Complete.as Per Ss20a, Km 0/0 -1/000, Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam(wmm) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250mm Thick With Pavers In Subbase/base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material,labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete., Km 0/0 -1/000, Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It.. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification., Km 0/0 -1/000, Providing And Laying Tack Coat Over Wmm Surface(treated With Primer) Using 2.5kg Of Bitumen Emulsion Rs-1 For 10sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification.., Km 0/0 -1/000, Bituminous Concrete 25 Mm Thick Using Cmp (grade-ii) Providing And Laying Bituminious Concrete To 25mm Thick Using 0.13cum Of 19.00-9.50mm. 0.17cum Of 9.5-2.36 And Below With 50.3kgs Of Vg30/vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory/phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.including Hire Charges And Fuel Charges Foe 20-30t Cmp With Bitumen Boiler, Tipper Trucks,paver Finisher/9m Paver Finisher,vibratory/phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5, Km 0/0 -1/000, Providing And Laying Gravel Soling To Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Watering And Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction At Optimum Moisture Content And Hire & Fuel Charges For Power Roller , Water Sprinkler And All Other Incidental Charges Such As Traffic Barricading And Providing Danger Lights Etc, Complete., Km 0/0 -1/000, Provision For Km Stone, Hm Stone,guardstone,name Board, Logo Board And Cautionary Sign Boards Etc., Km Stone, Hm Stone, Provision For Information Board, Provision For Sign Board, Provisions For Road White Marking (rs.890/sq.m), Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount (both Construction And Maintenance) Above This Row In Column \"bb\" For All Works In This Package}
Procurement Summary
Location
Organisation Name
Amount
AOC Date
Dindigul, Tamil Nadu, India
Rural Development And Panchayat Raj Department
9560298.07
21st Mar, 2025
Work Description
L1 Details
Awarded Value
Selected Bidder
9560298.07
V.Murugesan

