Supply Of Centre Pivot Pin Complete - Improved Design (for 20t Bogie)to Drg No.329-0-6- 023 Col.i Alt nil .item Shall Be Covered With Plastic Sheet (thickness Not Less Than 50 Mic Rons Minimum)and Wooden Packing Is Not Required. The Supplier Shall Ensure That The M Achined Area To Be Protected By Suitable Means To Avoid Damages During Transit, Handli Ng And Storage. [ Warranty Period: 30 Months After The Date Of Delivery ]
Procurement Summary
Location
Organisation Name
Amount
AOC Date
Chennai, Tamil Nadu, India
INTEGRAL COACH FACTORY
8188121.48
27th Jun, 2025
Work Description
L1 Details
Awarded Value
Selected Bidder
8188121.48
M/s. SARITA FORGINGS LIMITED

