Lws Pp-2 Shell Kit (a) One Coach Set Of Roof, Sidewall And End Wall For Amrit Bharat L Ws/pp2 (754) 1. Roof Assembly To Drg No 75416001, Alt Nil- 1 No, 2. End Roof Assembly To Drg No 9721 6008, Alt a - 2 Nos 3. Side Wall To Drg No 75414001,alt a - 1 No Welding Pin Arrangement To Drg No 58 110037 Alt nil Has To Be Assembled On Roof And Sidewall While Supplying. 4. End Wall To Drg No 75415 001, Alt b - 2 Nos The Firm Shall Fulfil The Requirement As Per Icf//md/specn.200, Issue Status01, Re V 04 With Amendment No 01. The Firm Shall Fulfil The Requirement As Per Icf/md/spec-315,i Ssue Status-01,rev.00 Firm Has To Supply Roof And Sidewall Without Applying Etch Primer And The Fir M Has To Apply Etch Primer On Roof And Sidewall In Icf After Shell Assembly. (b) One Coach Set Of Bo Dy Shell Items And Partition Frames For Lws/pp2 (754) Coaches To Drg Nos, 1. 75410041, Alt Ni L - 1 No 2. 75410002, Alt b - 1 No 3. 75410006, Alt Nil - 2 Nos 4. 58110054, Alt e - 1 No 5. 67010011, Alt a - 2 Nos 6. Aaa10488, Alt c - 6 Nos 7. 58110017, Alt b - 2 Nos 8. Aab10338, Alt Nil - 24 Nos 9. A Ai10188, Alt Nil - 4 Nos (c) Under Frame Arrangement To Drg No. Lws Pp 67011001, Alt l . Specia L Condition : A) -packing As Per Icf/j&t/misc-2201, Alt e , Safety Instruction As Per Icf/j&t/sk-1 867, Alt. nil -packing As Per Icf/j&t/sk-1809, Alt a . B) - Packing Condition As Per Icf/j&t/sk- 1865, Alt \"a\". C)packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt b The Underframe Sh Ould Be Supplied As Normal Side Up And Side Bearer Side Down. [safety Item ]
Procurement Summary
Location
Organisation Name
Amount
AOC Date
Chennai, Tamil Nadu, India
INTEGRAL COACH FACTORY
283868954.98
16th Jun, 2025
Work Description
L1 Details
Awarded Value
Selected Bidder
283868954.98
M/s. UNIVERSAL ENGINEERS CHENNAI PVT LTD

