Tender Results
Supply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner To Rdso Drawing No-t-8751 With Latest Alterations For Use With Wider Psc Sleeper To Drawing No. Rdso/ T-8746 Suitable To Rail
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12818380
AOC Date: 23rd Jun, 2025
Amount: ₹3252552.00
View DetailsSupply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner To Rdso Drawing No-t-8751 With Latest Alterations For Use With Wider Psc Sleeper To Drawing No. Rdso/ T-8746 Suitable To Rail
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12818381
AOC Date: 23rd Jun, 2025
Amount: ₹23428569.60
View DetailsSupply Of End Wall Complete For Lwaccw/eog Coaches To Drg. No. (lwscwac/eog) 5931 5007 Col-i Alt \"b\". Special Condition : Packing As Per Drg, Icf/j&t/sk-1809, Alt a [safety Item ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
ITB id: 12818382
AOC Date: 23rd Jun, 2025
Amount: ₹74049248.00
View DetailsSupply Of goods, Manufacturing And Supply Of High Viscous Nylon-66 Insulating Liner To Rdso Drawing No-t-8751 With Latest Alterations For Use With Wider Psc Sleeper To Drawing No. Rdso/ T-8746 Suitable To Rail
Organization: NORTHERN RAILWAY
Location: Multi city, Multi State, India
ITB id: 12818383
AOC Date: 23rd Jun, 2025
Amount: ₹35142854.40
View DetailsSupply Of End Wall Complete For Lwaccw/eog Coaches To Drg. No. (lwscwac/eog) 5931 5007 Col-i Alt \"b\". Special Condition : Packing As Per Drg, Icf/j&t/sk-1809, Alt a [safety Item ]
Organization: INTEGRAL COACH FACTORY
Location: Chennai, Tamil Nadu, India
ITB id: 12818384
AOC Date: 23rd Jun, 2025
Amount: ₹8035564.00
View DetailsSupply Of Axle Box Housing (finished Machined) To Icf Drg. No. T-0-2-602 Alt-v/14, Item No.- 2, Sheet No. 1 And 2. Material And Specification Conforming To Rdso Specification No. Rdso/2007/cg-08, With Am Endment Slip No. 1 No.1 Of July-2009. [ Warranty Period: 36 Months After The Date Of Delivery ]
Organization: CENTRAL RAILWAY
Location: Mumbai, Maharashtra, India
ITB id: 12818385
AOC Date: 23rd Jun, 2025
Amount: ₹25003728.00
View DetailsSupply Of Tamping Depth Transducer - Elt-903-00001-u/1000 , Make: Plasser [ Warranty Period: 6 Months After The Date Of Delivery ]
Organization: South East Central Railway
Location: Bilaspur, Chhattisgarh, India
ITB id: 12818386
AOC Date: 23rd Jun, 2025
Amount: ₹1612868.84
View DetailsSupply Of main Compressor 1750/1745 Lpm With Motor Under Slung Type For Used In Three Phase Locomotives As Per (i) Rdso Spec No. Rdso/2018 /el /spec /0137 Rev. 0, (ii) Str No. Rdso /2007/el /str /0015 Rev 1 And
Organization: Western Railway
Location: Multi city, Multi State, India
ITB id: 12818387
AOC Date: 23rd Jun, 2025
Amount: ₹78801006.52
View DetailsSupply Of 4.5 Kw Underslung Type Constant Voltage Regulated Cum Emergency Battery Charger For Lhb Ac & Non Ac Coaches As Per Rdso Specification No-rdso/pe/spec/ac/0183(rev.1)-2018 Or Latest. [ Warr Anty Period: 30 Months After The Date Of Delivery ]
Organization: South East Central Railway
Location: Bilaspur, Chhattisgarh, India
ITB id: 12818388
AOC Date: 23rd Jun, 2025
Amount: ₹3412560.00
View DetailsSupply Of 4.5 Kw Underslung Type Constant Voltage Regulated Cum Emergency Battery Charger For Lhb Ac & Non Ac Coaches As Per Rdso Specification No-rdso/pe/spec/ac/0183(rev.1)-2018 Or Latest. [ Warr Anty Period: 30 Months After The Date Of Delivery ]
Organization: South East Central Railway
Location: Bilaspur, Chhattisgarh, India
ITB id: 12818389
AOC Date: 23rd Jun, 2025
Amount: ₹619500.00
View DetailsSupply Of Set Of Prevailing Torque
Organization: Eastern Railway
Location: Halisahar, West Bengal, India
ITB id: 12818390
AOC Date: 23rd Jun, 2025
Amount: ₹553817.70
View DetailsSupply Of single Core Cable 4 Gkw-a X 35 1800 V Bk As Per Specn. Clw Specification No.clw/es/3/0458/e
Organization: Banaras Locomotive Works
Location: Multi city, Multi State, India
ITB id: 12818391
AOC Date: 23rd Jun, 2025
Amount: ₹4889988.25
View DetailsSupply Of Helical Spring For High Power Dmu/dpc 1400 Hp Coaches (engine Side) As Per Icf Drg. No. Dmu/dpc 5-0-1-501, Item No. 2, Alt-1 & Nil , Confirming To Rdso Spec. No. Wd-01-hls-94, Rev.4 O F June. 22, Material Is: 3195/92 With Amndt. No. 2. [ Warranty Period: 60 Months After The Date Of De Livery ]
Organization: North Eastern Railway
Location: Bareilly, Uttar Pradesh, India
ITB id: 12818392
AOC Date: 23rd Jun, 2025
Amount: ₹1444025.00
View DetailsSupply Of Twin Beam Led Headlight Unit For Diesel Hhp Locomotives As Per Rdso Spec.no.rdso/2017/el/spec/0134 Rev.03 Or Latest And As Per Blw Drawing Part No.18361511, With Input Voltage Of 74 Vdc,control Unit Should Be Prefera Bly Inbuilt With Head Light, Mounting And Other Dimension Should Be As Per Blw Drawing, Strictly. [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Organization: South Central Railway
Location: Kazipet, Telangana, India
ITB id: 12818393
AOC Date: 23rd Jun, 2025
Amount: ₹913792.00
View DetailsSupply Of Set Of Actuator Repairing Kit (motorpal Actuator) Confirming To Greaves Cotton Part No - 105 200246446 Suitable For 500 Kva Cpcb-ii Greaves Cotton Engines Of Lhb Powercars. (1 Set = 02 Nos Actuato R) [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: West Central Railway
Location: Jabalpur, Madhya Pradesh, India
ITB id: 12818394
AOC Date: 23rd Jun, 2025
Amount: ₹858276.97
View DetailsSupply And Fitment Of Side Wheel & Rear Wheel Components And Spring-loaded Wheel Arrange Ment System For 25ton Universal Jmp-jack With Base Plate For Free Movement Of Jack, With Very Easy Fitmen T Of Lifting Claw To The Pad During Lifting. During Off Load The Jack To Rest On Wheel And During Load The Jack S Hould Automatically Transferred On Base Frame With Complete Mechanical Arrangement As Per Jmp Sk. No.- 25t/jmp/jack/01/2024 Qty.: - 01 Set Consisting Of 5 Nos. (for 1 No. Consisting Of All Items As Per Mentioned Drawing). [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: Jamalpur, Bihar, India
ITB id: 12818395
AOC Date: 23rd Jun, 2025
Amount: ₹4858919.04
View DetailsSupply Of Set Of Tpu Ring For Secondary Suspension In Nac Lhb Coaches Consisting Of 02 (two) Ite Ms As Per Rdso Drg. No. Cg-20057 Alt. 1 . One Set Consist Of 01 (one) No. Inner Ring & 01 (one) No. Ou Ter Ring. As Per Drg.no. Rdso Drg. No. Cg-20057 Alt. 1 Specn: Rdso Drg. No. Cg-20057 Alt. 1 [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Organization: Western Railway
Location: Mumbai, Maharashtra, India
ITB id: 12818396
AOC Date: 23rd Jun, 2025
Amount: ₹1274400.00
View DetailsSupply Of Low Pressure Cylinder For Elgi Compressor As Per Elgi Part No:- 070304210 Of Wdg4 Loco [ Warranty Period: 30 Months After The Date Of Delivery ]
Organization: Eastern Railway
Location: Durgapur, West Bengal, India
ITB id: 12818397
AOC Date: 23rd Jun, 2025
Amount: ₹1990612.80
View DetailsSupply Of Synthetic Thermoplastic Tpv Water Hose 50mm, As Per Drawing: Mdts-234 Rev.1 , Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Organization: Rail Coach Factory
Location: Kanakapura, Karnataka, India
ITB id: 12818398
AOC Date: 23rd Jun, 2025
Amount: ₹665455.10
View DetailsSupply Of Spring Loaded Switch For Headlight And Headlight Intencity (50% Each) For Wap-7 & Wa G-9 (3 Phase) Locos. As Per Clw s Specn. No. Clw/es/3/0075, Alt-b. [ Warranty Period: 30 Months A Fter The Date Of Delivery ]
Organization: Eastern Railway
Location: Kanchrapara, West Bengal, India
ITB id: 12818399
AOC Date: 23rd Jun, 2025
Amount: ₹2056032.00
View Details
