Supply Of Front Part(schedule Of Infrastructural Requirements To Mdts21261 Rev-03 Dated 09.06.2020) To Be Masked As Per Drg. No Mi005396 Alt. e For Lhb Type Coach. Note:- ( 1) Protection Procedure As Per Dy Cple-iii Annexure-app Dated 14/05/2024. (2) Dimensions As Per Dy Cple -iii Annexure-ufp Dated 15/05/2024., As Per Drawing: Mp13uframebio Version 3, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauge S And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It Fr Om Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]

Procurement Summary

Location

Organisation Name

Amount

AOC Date

Kanakapura, Karnataka, India

Rail Coach Factory

26807240.00

23rd Jun, 2025

Work Description

L1 Details

Awarded Value

Selected Bidder

26807240.00

M/s. PUSHKAR TECHNO PRIVATE LIMITED

Want to bid in this tender?

Get local agent support on this tender.

Contact Us
← Back to List
Scroll to Top